Cressington
CSGNorth WestManaged by Merseyrail
How this station is performing
Cressington had 42,345 scheduled stops to Period 7 of 2026-27, about 116 a day. 91.5% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Cressington opened on 1 March 1873 and closed to passengers on 17 April 1972. It reopened on 3 January 1978, 48 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Aigburth is the oldest (1864) and West Allerton the newest (1939), with Cressington in between.
The nearest stations to Cressington are West Allerton (1.2 km north), Aigburth (1.2 km north-west), Liverpool South Parkway (1.5 km east), Mossley Hill (2.2 km north) and St Michaels (3.4 km north-west). 36 stations lie within 10 km in all. Of the five, St Michaels is the most punctual at 95.6% and West Allerton the least at 75.3%, with Cressington on 91.5%.
In North West, Cressington ranks 46th of 315 ranked stations. Its 91.5% is 10.1 percentage points better than the area median of 81.4%.
Compared with 3 stations of a similar size in North West, Cressington is the most punctual, at 91.5%. The comparison group includes Heaton Chapel (83.5%), Wigan Wallgate (76.8%) and Levenshulme (81.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 42,345 | 91.5% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Cressington? Delay Repay
These operators call at Cressington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,514 | 92.8% | 2.1% |
| Period 6 of 2026-27 | 3,352 | 93.0% | 1.6% |
| Period 5 of 2026-27 | 3,354 | 89.8% | 1.9% |
| Period 4 of 2026-27 | 3,027 | 90.7% | 1.4% |
| Period 3 of 2026-27 | 3,347 | 92.9% | 2.3% |
| Period 2 of 2026-27 | 3,352 | 92.5% | 0.7% |
| Period 1 of 2026-27 | 3,827 | 91.7% | 3.1% |
| Period 13 of 2025-26 | 3,617 | 93.0% | 2.1% |
| Period 12 of 2025-26 | 3,352 | 91.2% | 1.0% |
| Period 11 of 2025-26 | 3,297 | 91.8% | 2.1% |
| Period 10 of 2025-26 | 2,903 | 91.5% | 1.5% |
| Period 9 of 2025-26 | 3,165 | 89.9% | 2.1% |
| Period 8 of 2025-26 | 3,238 | 88.7% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heaton Chapel | 42,306 | 83.5% | 2.9% |
| Wigan Wallgate | 42,110 | 76.8% | 2.8% |
| Levenshulme | 42,048 | 81.7% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out