Heaton Chapel
HTCNorth WestManaged by Northern Trains
How this station is performing
Heaton Chapel had 42,306 scheduled stops to Period 7 of 2026-27, about 116 a day. 83.5% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Heaton Chapel opened on 1 January 1852, 174 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Levenshulme is the oldest (1842) and Burnage the newest (1910), with Heaton Chapel in between.
The nearest stations to Heaton Chapel are Reddish South (1.7 km north-east), Mauldeth Road (2.1 km north-west), Levenshulme (2.3 km north-west), Burnage (2.4 km west) and Stockport (2.5 km south-east). 48 stations lie within 10 km in all. At 83.5%, Heaton Chapel is more punctual than every one of them; the best of the five, Levenshulme, manages 81.7%.
Heaton Chapel takes its name from a suburb called Heaton Chapel, and the station stands 0.7 km from its centre.
The time of year matters a great deal for Heaton Chapel. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 75.0%, while period 13 (March) is the strongest at 88.3%, a spread of 13.3 percentage points.
1 of 3 stations of a similar size in North West are more punctual than Heaton Chapel on 83.5%. The comparison group includes Cressington (91.5%), Wigan Wallgate (76.8%) and Levenshulme (81.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 42,306 | 83.5% | 2.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,299 | 83.8% | 2.5% |
| Period 6 of 2026-27 | 3,348 | 85.9% | 1.5% |
| Period 5 of 2026-27 | 3,272 | 83.1% | 1.8% |
| Period 4 of 2026-27 | 3,279 | 82.8% | 2.8% |
| Period 3 of 2026-27 | 3,013 | 84.6% | 1.8% |
| Period 2 of 2026-27 | 3,333 | 84.6% | 3.2% |
| Period 1 of 2026-27 | 3,765 | 86.2% | 6.0% |
| Period 13 of 2025-26 | 3,633 | 87.2% | 1.5% |
| Period 12 of 2025-26 | 2,346 | 84.7% | 1.3% |
| Period 11 of 2025-26 | 3,289 | 82.6% | 3.8% |
| Period 10 of 2025-26 | 3,064 | 84.7% | 4.7% |
| Period 9 of 2025-26 | 3,329 | 75.9% | 3.8% |
| Period 8 of 2025-26 | 3,336 | 79.3% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cressington | 42,345 | 91.5% | 1.9% |
| Wigan Wallgate | 42,110 | 76.8% | 2.8% |
| Levenshulme | 42,048 | 81.7% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out