Wigan Wallgate
WGWNorth WestManaged by Northern Trains
How this station is performing
Wigan Wallgate had 42,110 scheduled stops to Period 7 of 2026-27, about 116 a day. 76.8% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Wigan Wallgate opened on 20 November 1848. It was moved to the site it uses now on 2 February 1896. Among the 5 stations nearest to it with a known opening date, Wigan North Western is the oldest (1832) and Ince (Manchester) the newest (1863), with Wigan Wallgate in between.
The nearest stations to Wigan Wallgate are Wigan North Western (0.2 km south), Ince (Manchester) (1.6 km south-east), Pemberton (2.9 km south-west), Hindley (3.9 km east) and Gathurst (4.3 km west). 17 stations lie within 10 km in all. Of the five, Pemberton is the most punctual at 82.2% and Gathurst the least at 66.1%, with Wigan Wallgate on 76.8%.
Wigan Wallgate is named after Wigan, a big city, home to about 103,608 people, but the station stands 0.2 km from its centre.
For Wigan Wallgate, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 67.0% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 93.1%, which is 26.1 percentage points higher. Cancellations peaked at 8.6% of scheduled stops in Period 6 of 2024-25, against 2.8% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Wigan Wallgate is the least punctual, at 76.8%. All of them are ahead, including Levenshulme (81.7%), Heaton Chapel (83.5%) and Cressington (91.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 42,110 | 76.8% | 2.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,247 | 74.8% | 1.4% |
| Period 6 of 2026-27 | 3,259 | 76.1% | 2.0% |
| Period 5 of 2026-27 | 2,932 | 80.2% | 4.9% |
| Period 4 of 2026-27 | 3,241 | 76.6% | 3.1% |
| Period 3 of 2026-27 | 2,894 | 78.5% | 2.3% |
| Period 2 of 2026-27 | 3,250 | 75.9% | 2.5% |
| Period 1 of 2026-27 | 3,786 | 81.8% | 1.1% |
| Period 13 of 2025-26 | 3,511 | 80.4% | 2.8% |
| Period 12 of 2025-26 | 3,247 | 79.5% | 2.3% |
| Period 11 of 2025-26 | 3,254 | 79.7% | 2.3% |
| Period 10 of 2025-26 | 2,966 | 75.5% | 4.4% |
| Period 9 of 2025-26 | 3,252 | 67.0% | 4.0% |
| Period 8 of 2025-26 | 3,271 | 71.4% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Levenshulme | 42,048 | 81.7% | 2.8% |
| Heaton Chapel | 42,306 | 83.5% | 2.9% |
| Cressington | 42,345 | 91.5% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out