Coventry Arena
CAAWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Coventry Arena had 12,193 scheduled stops to Period 7 of 2026-27, about 34 a day. 85.9% of recorded arrivals were within three minutes of the timetable and 5.8% of scheduled stops were cancelled.
Coventry Arena opened on 18 January 2016, 10 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Coventry Arena is the newest; the oldest, Coventry, opened in 1838.
The nearest stations to Coventry Arena are Bedworth (4.0 km north-east), Coventry (5.3 km south), Canley (6.4 km south-west), Bermuda Park (6.4 km north) and Tile Hill (9.0 km south-west). 6 stations lie within 10 km in all. Of the five, Bermuda Park is the most punctual at 88.6% and Coventry the least at 62.5%, with Coventry Arena on 85.9%.
Coventry Arena is named after Coventry, a big city, home to about 362,690 people, but the station stands 3.7 km from its centre.
Cancellations are a particular problem at Coventry Arena. 5.8% of scheduled stops did not happen, 2.1 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2223rd of 2,374.
1 of 3 stations of a similar size in West Midlands are more punctual than Coventry Arena on 85.9%. The comparison group includes Atherstone (51.4%), Kenilworth (83.4%) and Bedworth (87.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 12,193 | 85.9% | 5.8% |
Operators with their own page for this station are linked to it.
Late train at Coventry Arena? Delay Repay
These operators call at Coventry Arena and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 961 | 85.7% | 5.8% |
| Period 6 of 2026-27 | 969 | 85.8% | 4.9% |
| Period 5 of 2026-27 | 947 | 85.2% | 6.7% |
| Period 4 of 2026-27 | 884 | 84.7% | 4.8% |
| Period 3 of 2026-27 | 792 | 82.1% | 6.1% |
| Period 2 of 2026-27 | 856 | 86.1% | 6.5% |
| Period 1 of 2026-27 | 1,111 | 87.5% | 7.7% |
| Period 13 of 2025-26 | 1,061 | 90.6% | 6.0% |
| Period 12 of 2025-26 | 965 | 89.5% | 1.6% |
| Period 11 of 2025-26 | 927 | 87.2% | 5.6% |
| Period 10 of 2025-26 | 877 | 83.9% | 12.1% |
| Period 9 of 2025-26 | 964 | 84.0% | 5.5% |
| Period 8 of 2025-26 | 879 | 82.7% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Atherstone | 12,252 | 51.4% | 6.5% |
| Kenilworth | 12,253 | 83.4% | 5.5% |
| Bedworth | 12,133 | 87.9% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out