Bedworth
BEHWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Bedworth had 12,133 scheduled stops to Period 7 of 2026-27, about 33 a day. 87.9% of recorded arrivals were within three minutes of the timetable and 5.8% of scheduled stops were cancelled.
Bedworth opened on 12 September 1850 and closed to passengers on 18 January 1965. It reopened on 16 May 1988, 38 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Coventry is the oldest (1838) and Coventry Arena the newest (2016), with Bedworth in between.
The nearest stations to Bedworth are Bermuda Park (2.7 km north), Coventry Arena (4.0 km south-west), Nuneaton (5.3 km north), Hinckley (Leics) (9.0 km north-east) and Coventry (9.3 km south). 5 stations lie within 10 km in all. Of the five, Bermuda Park is the most punctual at 88.6% and Coventry the least at 62.5%, with Bedworth on 87.9%.
Bedworth takes its name from a market town called Bedworth, home to about 31,090 people, and the station stands 0.8 km from its centre.
1 of 3 stations of a similar size in West Midlands are more punctual than Bedworth on 87.9%. The comparison group includes Bermuda Park (88.6%), Stone (Staffs) (67.0%) and Coventry Arena (85.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 12,133 | 87.9% | 5.8% |
Operators with their own page for this station are linked to it.
Late train at Bedworth? Delay Repay
These operators call at Bedworth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 960 | 89.0% | 5.8% |
| Period 6 of 2026-27 | 958 | 88.6% | 4.7% |
| Period 5 of 2026-27 | 944 | 87.6% | 6.6% |
| Period 4 of 2026-27 | 884 | 87.2% | 4.8% |
| Period 3 of 2026-27 | 789 | 83.9% | 6.1% |
| Period 2 of 2026-27 | 856 | 88.3% | 6.7% |
| Period 1 of 2026-27 | 1,102 | 88.7% | 7.7% |
| Period 13 of 2025-26 | 1,058 | 91.2% | 6.0% |
| Period 12 of 2025-26 | 956 | 90.6% | 1.6% |
| Period 11 of 2025-26 | 924 | 88.2% | 5.6% |
| Period 10 of 2025-26 | 872 | 86.4% | 12.2% |
| Period 9 of 2025-26 | 958 | 86.1% | 5.4% |
| Period 8 of 2025-26 | 872 | 84.6% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bermuda Park | 12,133 | 88.6% | 5.8% |
| Stone (Staffs) | 12,125 | 67.0% | 4.2% |
| Coventry Arena | 12,193 | 85.9% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out