Congleton
CNGNorth WestManaged by Northern Trains
How this station is performing
Congleton had 11,474 scheduled stops to Period 7 of 2026-27, about 32 a day. 78.1% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Congleton opened on 9 October 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Holmes Chapel is the oldest (1842) and Goostrey the newest (1891), with Congleton in between.
The nearest stations to Congleton are Kidsgrove (8.6 km south-west), Alsager (10.1 km south-west), Goostrey (11.5 km north-west), Holmes Chapel (11.5 km north-west) and Macclesfield (12.3 km north-east). 1 stations lie within 10 km in all. Of the five, Goostrey is the most punctual at 82.5% and Macclesfield the least at 61.5%, with Congleton on 78.1%.
Congleton takes its name from a town called Congleton, home to about 28,488 people, and the station stands 1.7 km from its centre.
Across the whole run of data, the weakest four-week period for Congleton was Period 9 of 2024-25, at 68.2%, some time before the latest year. The strongest was Period 1 of 2023-24, at 88.5%, and the two are 20.3 percentage points apart. Cancellations peaked at 10.3% of scheduled stops in Period 4 of 2025-26, against 2.5% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Congleton on 78.1%. The comparison group includes Ashton-under-Lyne (81.6%), Kearsley (Manchester) (54.3%) and Kendal (86.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,474 | 78.1% | 2.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 872 | 78.7% | 2.2% |
| Period 6 of 2026-27 | 876 | 78.9% | 0.6% |
| Period 5 of 2026-27 | 872 | 76.2% | 0.9% |
| Period 4 of 2026-27 | 872 | 76.0% | 1.3% |
| Period 3 of 2026-27 | 876 | 79.6% | 1.1% |
| Period 2 of 2026-27 | 872 | 78.8% | 1.5% |
| Period 1 of 2026-27 | 1,015 | 79.1% | 5.3% |
| Period 13 of 2025-26 | 950 | 82.1% | 1.8% |
| Period 12 of 2025-26 | 860 | 80.3% | 2.0% |
| Period 11 of 2025-26 | 872 | 80.7% | 2.6% |
| Period 10 of 2025-26 | 794 | 77.0% | 4.2% |
| Period 9 of 2025-26 | 871 | 70.2% | 7.0% |
| Period 8 of 2025-26 | 872 | 76.9% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ashton-under-Lyne | 11,543 | 81.6% | 3.4% |
| Kearsley (Manchester) | 11,318 | 54.3% | 3.6% |
| Kendal | 11,636 | 86.3% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out