Strawberry Hill
STWLondonManaged by South Western Railway
How this station is performing
Strawberry Hill had 31,153 scheduled stops to Period 7 of 2026-27, about 86 a day. 88.2% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Strawberry Hill opened on 1 December 1873, 153 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Twickenham is the oldest (1848) and Whitton (London) the newest (1930), with Strawberry Hill in between.
The nearest stations to Strawberry Hill are Fulwell (0.9 km south-west), Twickenham (1.4 km north-east), Teddington (1.7 km south), Whitton (London) (1.7 km north-west) and St Margarets (London) (2.2 km north-east). 60 stations lie within 10 km in all. Of the five, Whitton (London) is the most punctual at 91.1% and Fulwell the least at 85.5%, with Strawberry Hill on 88.2%.
Strawberry Hill takes its name from an area of London called Strawberry Hill, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Strawberry Hill was Period 9 of 2024-25, at 72.5%, some time before the latest year. The strongest was Period 5 of 2023-24, at 93.4%, and the two are 20.9 percentage points apart. Cancellations peaked at 6.5% of scheduled stops in Period 1 of 2025-26, against 3.0% over the latest 13 periods.
2 of 3 stations of a similar size in London are more punctual than Strawberry Hill on 88.2%. The comparison group includes Rainham (Essex) (92.5%), Dagenham Dock (92.5%) and Chelsfield (80.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 31,153 | 88.2% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Strawberry Hill? Delay Repay
These operators call at Strawberry Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,316 | 91.4% | 2.7% |
| Period 6 of 2026-27 | 2,318 | 90.3% | 1.9% |
| Period 5 of 2026-27 | 2,291 | 89.1% | 2.2% |
| Period 4 of 2026-27 | 2,308 | 90.9% | 2.1% |
| Period 3 of 2026-27 | 2,246 | 86.6% | 2.3% |
| Period 2 of 2026-27 | 2,655 | 86.0% | 5.3% |
| Period 1 of 2026-27 | 2,738 | 90.9% | 2.7% |
| Period 13 of 2025-26 | 2,430 | 91.4% | 1.2% |
| Period 12 of 2025-26 | 2,337 | 87.9% | 4.6% |
| Period 11 of 2025-26 | 2,381 | 90.4% | 2.4% |
| Period 10 of 2025-26 | 2,255 | 88.9% | 3.9% |
| Period 9 of 2025-26 | 2,476 | 80.5% | 2.6% |
| Period 8 of 2025-26 | 2,402 | 82.4% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rainham (Essex) | 31,451 | 92.5% | 2.6% |
| Dagenham Dock | 31,458 | 92.5% | 2.6% |
| Chelsfield | 30,636 | 80.2% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out