Carmarthen
CMNWalesManaged by TfW Rail
How this station is performing
Carmarthen had 26,501 scheduled stops to Period 7 of 2026-27, about 73 a day. 74.8% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Carmarthen opened on 1 March 1860. It was moved to the site it uses now on 1 July 1902. Of the 5 stations nearest to it with a known opening date, Carmarthen is the newest; the oldest, Ferryside, opened in 1852.
Carmarthen is remote: its nearest neighbours are Ferryside (10.4 km south-west), Kidwelly (13.2 km south), Pembrey and Burry Port (19.2 km south), Llandybie (21.1 km east) and Whitland (21.6 km west). At 74.8%, Carmarthen is more punctual than every one of them; the best of the five, Pembrey and Burry Port, manages 70.6%.
Carmarthen takes its name from a market town called Carmarthen, home to about 14,638 people, and the station stands 0.8 km from its centre.
2 operators call at Carmarthen: Transport for Wales (74.0%, 82% of stops) and Great Western Railway (78.5%, 18% of stops). They are close together, with Great Western Railway leading on 78.5% and Transport for Wales trailing on 74.0%, a gap of 4.5 percentage points.
Compared with 3 stations of a similar size in Wales, Carmarthen is the most punctual, at 74.8%. The comparison group includes Llanelli (69.9%), Severn Tunnel Junction (73.3%) and Flint (74.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,858 | 74.0% | 2.7% |
| Great Western Railway | 4,643 | 78.5% | 6.0% |
Operators with their own page for this station are linked to it.
Late train at Carmarthen? Delay Repay
These operators call at Carmarthen and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,956 | 77.1% | 3.3% |
| Period 6 of 2026-27 | 2,162 | 75.4% | 2.1% |
| Period 5 of 2026-27 | 2,168 | 69.6% | 4.1% |
| Period 4 of 2026-27 | 2,139 | 71.0% | 4.5% |
| Period 3 of 2026-27 | 2,136 | 74.9% | 3.6% |
| Period 2 of 2026-27 | 2,059 | 74.6% | 4.5% |
| Period 1 of 2026-27 | 2,333 | 75.1% | 2.3% |
| Period 13 of 2025-26 | 2,201 | 78.6% | 1.7% |
| Period 12 of 2025-26 | 2,000 | 84.0% | 1.3% |
| Period 11 of 2025-26 | 1,974 | 83.4% | 3.0% |
| Period 10 of 2025-26 | 1,809 | 74.0% | 3.3% |
| Period 9 of 2025-26 | 1,936 | 61.7% | 5.4% |
| Period 8 of 2025-26 | 1,628 | 71.8% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Llanelli | 25,802 | 69.9% | 3.5% |
| Severn Tunnel Junction | 29,878 | 73.3% | 4.4% |
| Flint | 30,273 | 74.4% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out