Great Western Railway at Carmarthen
All trains at CarmarthenGreat Western Railway across BritainWales
How this operator is doing here
Great Western Railway had 4,643 scheduled stops at Carmarthen in the 13 periods to Period 7 of 2026-27, 18% of the station's total. 78.5% of recorded arrivals came within three minutes and 6.0% of stops were cancelled.
Great Western Railway trains at Carmarthen also serve Ferryside (10.4 km south-west, – on time, – cancelled), Kidwelly (13.2 km south, – on time, – cancelled), Pembrey and Burry Port (19.2 km south, 76.6% on time, 6.0% cancelled), Whitland (21.6 km west, – on time, – cancelled), Llanelli (22.3 km south-east, 76.0% on time, 6.0% cancelled) and Narberth (29.6 km west, – on time, – cancelled), which are the stations on its network closest to Carmarthen.
The busiest Great Western Railway station within 30 km of Carmarthen is Llanelli, 22.3 km south-east, with about 13 scheduled stops a day.
Of the 2 operators with enough records at Carmarthen, Great Western Railway is the most punctual, at 78.5%.
For Great Western Railway, Carmarthen is the 84th best of 210 ranked stations. Its 78.5% here is 2.8 percentage points above the 75.7% across the whole network.
Great Western Railway at Carmarthen has not moved in one direction over three full railway years: 75.7% within three minutes in 2023-24, 80.2% in 2024-25 and 78.2% in 2025-26.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 346 | 81.7% | 8.4% |
| Period 6 of 2026-27 | 377 | 78.5% | 7.4% |
| Period 5 of 2026-27 | 378 | 68.8% | 5.8% |
| Period 4 of 2026-27 | 377 | 74.7% | 4.8% |
| Period 3 of 2026-27 | 373 | 79.4% | 6.2% |
| Period 2 of 2026-27 | 372 | 76.8% | 4.0% |
| Period 1 of 2026-27 | 424 | 83.4% | 4.7% |
| Period 13 of 2025-26 | 402 | 79.6% | 3.5% |
| Period 12 of 2025-26 | 336 | 90.8% | 3.0% |
| Period 11 of 2025-26 | 295 | 83.4% | 2.0% |
| Period 10 of 2025-26 | 336 | 74.8% | 4.5% |
| Period 9 of 2025-26 | 347 | 69.8% | 17.0% |
| Period 8 of 2025-26 | 280 | 78.1% | 7.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Carmarthen
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,858 | 74.0% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out