Transport for Wales at Carmarthen
All trains at CarmarthenTransport for Wales across BritainWales
How this operator is doing here
Transport for Wales had 21,858 scheduled stops at Carmarthen in the 13 periods to Period 7 of 2026-27, 82% of the station's total. 74.0% of recorded arrivals came within three minutes and 2.7% of stops were cancelled.
Transport for Wales trains at Carmarthen also serve Ferryside (10.4 km south-west, 69.6% on time, 2.3% cancelled), Kidwelly (13.2 km south, 68.4% on time, 2.3% cancelled), Pembrey and Burry Port (19.2 km south, 68.6% on time, 2.2% cancelled), Llandybie (21.1 km east, – on time, 4.7% cancelled), Whitland (21.6 km west, 67.8% on time, 3.4% cancelled) and Ffairfach (21.6 km east, – on time, 4.8% cancelled), which are the stations on its network closest to Carmarthen.
Within 30 km of here, Transport for Wales runs best at Llandeilo, 22.2 km east (80.7%), and worst at Narberth, 29.6 km west (58.5%).
The busiest Transport for Wales station within 30 km of Carmarthen is Llanelli, 22.3 km south-east, with about 58 scheduled stops a day.
Of the 2 operators with enough records at Carmarthen, Transport for Wales is the least punctual, at 74.0%.
Transport for Wales at Carmarthen has edged up: 74.0% of stops came within three minutes of the timetable in the latest 13 periods, 3.0 percentage points better than the 71.0% of the 13 before. Cancellations held steady at 2.7% of scheduled stops, against 2.4% before.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,610 | 76.1% | 2.2% |
| Period 6 of 2026-27 | 1,785 | 74.8% | 1.0% |
| Period 5 of 2026-27 | 1,790 | 69.7% | 3.7% |
| Period 4 of 2026-27 | 1,762 | 70.2% | 4.4% |
| Period 3 of 2026-27 | 1,763 | 74.0% | 3.0% |
| Period 2 of 2026-27 | 1,687 | 74.1% | 4.6% |
| Period 1 of 2026-27 | 1,909 | 73.3% | 1.8% |
| Period 13 of 2025-26 | 1,799 | 78.3% | 1.3% |
| Period 12 of 2025-26 | 1,664 | 82.6% | 1.0% |
| Period 11 of 2025-26 | 1,679 | 83.4% | 3.2% |
| Period 10 of 2025-26 | 1,473 | 73.9% | 3.1% |
| Period 9 of 2025-26 | 1,589 | 60.2% | 2.9% |
| Period 8 of 2025-26 | 1,348 | 70.5% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Carmarthen
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 4,643 | 78.5% | 6.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out