Cardenden
CDDScotlandManaged by ScotRail
How this station is performing
Cardenden had 15,063 scheduled stops to Period 7 of 2026-27, about 41 a day. 81.7% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Cardenden opened on 4 September 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kirkcaldy is the oldest (1847) and Glenrothes with Thornton the newest (1992), with Cardenden in between.
The nearest stations to Cardenden are Lochgelly (3.3 km west), Cowdenbeath (6.0 km south-west), Kirkcaldy (6.7 km south-east), Glenrothes with Thornton (7.7 km east) and Burntisland (9.5 km south). 7 stations lie within 10 km in all. Of the five, Lochgelly is the most punctual at 85.0% and Kirkcaldy the least at 78.2%, with Cardenden on 81.7%.
Cardenden takes its name from a town called Cardenden, home to about 5,420 people, and the station stands 1.1 km from its centre.
For Cardenden, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 67.5% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2025-26, at 90.8%, which is 23.3 percentage points higher. Cancellations peaked at 12.4% of scheduled stops in Period 8 of 2023-24, against 1.5% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Cardenden is the least punctual, at 81.7%. All of them are ahead, including Lochgelly (85.0%), Prestonpans (87.1%) and Drem (84.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 15,063 | 81.7% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Cardenden? Delay Repay
These operators call at Cardenden and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,334 | 67.5% | 1.1% |
| Period 6 of 2026-27 | 1,123 | 82.8% | 2.3% |
| Period 5 of 2026-27 | 1,125 | 80.7% | 1.9% |
| Period 4 of 2026-27 | 1,122 | 82.3% | 2.1% |
| Period 3 of 2026-27 | 1,121 | 84.4% | 2.0% |
| Period 2 of 2026-27 | 1,120 | 86.7% | 0.3% |
| Period 1 of 2026-27 | 1,289 | 83.9% | 1.8% |
| Period 13 of 2025-26 | 1,231 | 86.7% | 1.1% |
| Period 12 of 2025-26 | 1,120 | 85.3% | 0.6% |
| Period 11 of 2025-26 | 1,314 | 87.5% | 1.4% |
| Period 10 of 2025-26 | 972 | 79.5% | 0.7% |
| Period 9 of 2025-26 | 1,096 | 77.4% | 2.6% |
| Period 8 of 2025-26 | 1,096 | 78.4% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lochgelly | 15,058 | 85.0% | 1.5% |
| Prestonpans | 14,730 | 87.1% | 0.7% |
| Drem | 14,688 | 84.5% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out