Drem
DRMScotlandManaged by ScotRail
How this station is performing
Drem had 14,688 scheduled stops to Period 7 of 2026-27, about 40 a day. 84.5% of recorded arrivals were within three minutes of the timetable and 0.8% of scheduled stops were cancelled.
Drem opened on 22 June 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Drem is the oldest; the next oldest, Longniddry, dates from 1846.
The nearest stations to Drem are North Berwick (6.6 km north-east), Longniddry (7.2 km south-west), East Linton (7.9 km east), Prestonpans (13.2 km south-west) and Wallyford (16.0 km south-west). 3 stations lie within 10 km in all. Of the five, North Berwick is the most punctual at 91.6% and East Linton the least at 77.3%, with Drem on 84.5%.
Drem takes its name from a Village called Drem, and the station stands 0.2 km from its centre.
Drem has slipped sharply. 84.5% of stops came within three minutes of the timetable in the latest 13 periods, 5.5 percentage points worse than the 90.0% recorded in the 13 before. Cancellations fell to 0.8% of scheduled stops from 1.7%, which is 0.9 percentage points fewer.
2 of 3 stations of a similar size in Scotland are more punctual than Drem on 84.5%. The comparison group includes Prestonpans (87.1%), Dunbar (74.9%) and North Berwick (91.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 14,688 | 84.5% | 0.8% |
Operators with their own page for this station are linked to it.
Late train at Drem? Delay Repay
These operators call at Drem and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,167 | 81.6% | 1.2% |
| Period 6 of 2026-27 | 1,170 | 86.7% | 1.0% |
| Period 5 of 2026-27 | 1,180 | 80.2% | 0.3% |
| Period 4 of 2026-27 | 1,168 | 79.1% | 1.5% |
| Period 3 of 2026-27 | 1,169 | 83.3% | 1.6% |
| Period 2 of 2026-27 | 1,132 | 84.9% | 0.8% |
| Period 1 of 2026-27 | 1,276 | 84.1% | 0.6% |
| Period 13 of 2025-26 | 1,222 | 88.4% | 0.2% |
| Period 12 of 2025-26 | 1,112 | 87.6% | 0.4% |
| Period 11 of 2025-26 | 1,112 | 84.4% | 0.5% |
| Period 10 of 2025-26 | 939 | 84.0% | 0.7% |
| Period 9 of 2025-26 | 1,020 | 86.2% | 0.7% |
| Period 8 of 2025-26 | 1,021 | 88.8% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Prestonpans | 14,730 | 87.1% | 0.7% |
| Dunbar | 14,572 | 74.9% | 1.7% |
| North Berwick | 14,571 | 91.6% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out