GTR at Cambridge
How this operator is doing here
GTR had 64,016 scheduled stops at Cambridge in the 13 periods to Period 7 of 2026-27, 48% of the station's total. 68.5% of recorded arrivals came within three minutes and 8.4% of stops were cancelled.
GTR trains at Cambridge also serve Cambridge North (3.6 km north-east, 68.9% on time, 10.2% cancelled), Waterbeach (8.6 km north-east, 68.1% on time, 10.5% cancelled), Foxton (10.0 km south-west, 66.8% on time, 5.1% cancelled), Shepreth (11.5 km south-west, 69.8% on time, 5.1% cancelled), Meldreth (14.5 km south-west, 68.4% on time, 5.1% cancelled) and Royston (19.3 km south-west, 69.6% on time, 8.9% cancelled), which are the stations on its network closest to Cambridge.
Within 30 km of here, GTR runs best at Sandy, 29.6 km west (84.9%), and worst at Foxton, 10.0 km south-west (66.8%).
The busiest GTR station within 30 km of Cambridge is Royston, 19.3 km south-west, with about 138 scheduled stops a day.
GTR ranks 2nd of the 3 operators with enough records at Cambridge, on 68.5%.
GTR at Cambridge has slipped sharply. 68.5% of stops came within three minutes of the timetable in the latest 13 periods, 6.3 percentage points worse than the 74.8% recorded in the 13 before. Cancellations rose to 8.4% of scheduled stops from 6.7%, which is 1.7 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,112 | 52.7% | 6.1% |
| Period 6 of 2026-27 | 4,989 | 56.1% | 17.6% |
| Period 5 of 2026-27 | 4,842 | 62.6% | 9.5% |
| Period 4 of 2026-27 | 4,951 | 54.6% | 15.9% |
| Period 3 of 2026-27 | 4,960 | 72.8% | 9.1% |
| Period 2 of 2026-27 | 5,097 | 74.0% | 8.6% |
| Period 1 of 2026-27 | 5,860 | 78.0% | 7.4% |
| Period 13 of 2025-26 | 5,575 | 76.2% | 3.9% |
| Period 12 of 2025-26 | 4,821 | 76.9% | 6.7% |
| Period 11 of 2025-26 | 4,731 | 71.1% | 4.6% |
| Period 10 of 2025-26 | 3,131 | 68.8% | 4.2% |
| Period 9 of 2025-26 | 4,827 | 70.7% | 8.3% |
| Period 8 of 2025-26 | 5,120 | 71.5% | 6.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cambridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 55,173 | 86.1% | 2.5% |
| CrossCountry | 12,864 | 65.6% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out