CrossCountry at Cambridge
All trains at CambridgeCrossCountry across BritainEast of England
How this operator is doing here
CrossCountry had 12,864 scheduled stops at Cambridge in the 13 periods to Period 7 of 2026-27, 10% of the station's total. 65.6% of recorded arrivals came within three minutes and 5.1% of stops were cancelled.
CrossCountry trains at Cambridge also serve Cambridge North (3.6 km north-east, – on time, – cancelled), Waterbeach (8.6 km north-east, – on time, – cancelled), Audley End (21.7 km south, 92.7% on time, 5.8% cancelled), Ely (23.5 km north, 61.4% on time, 3.5% cancelled), Manea (33.8 km north, 61.9% on time, 3.1% cancelled) and Stansted Airport (35.0 km south, 77.3% on time, 6.6% cancelled), which are the stations on its network closest to Cambridge.
The busiest CrossCountry station within 30 km of Cambridge is Ely, 23.5 km north, with about 30 scheduled stops a day.
Of the 3 operators with enough records at Cambridge, CrossCountry is the least punctual, at 65.6%.
CrossCountry at Cambridge has slipped sharply. 65.6% of stops came within three minutes of the timetable in the latest 13 periods, 8.4 percentage points worse than the 74.0% recorded in the 13 before. Cancellations fell to 5.1% of scheduled stops from 5.6%, which is 0.5 percentage points fewer.
CrossCountry at Cambridge has not moved in one direction over three full railway years: 76.7% within three minutes in 2023-24, 76.9% in 2024-25 and 71.9% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 975 | 49.7% | 4.4% |
| Period 6 of 2026-27 | 1,080 | 52.5% | 3.3% |
| Period 5 of 2026-27 | 1,077 | 56.8% | 6.2% |
| Period 4 of 2026-27 | 1,051 | 62.7% | 7.0% |
| Period 3 of 2026-27 | 1,047 | 69.2% | 3.5% |
| Period 2 of 2026-27 | 856 | 69.4% | 4.1% |
| Period 1 of 2026-27 | 988 | 75.9% | 2.1% |
| Period 13 of 2025-26 | 1,087 | 73.6% | 5.2% |
| Period 12 of 2025-26 | 1,072 | 75.7% | 4.5% |
| Period 11 of 2025-26 | 1,023 | 75.6% | 2.9% |
| Period 10 of 2025-26 | 681 | 65.5% | 14.1% |
| Period 9 of 2025-26 | 1,067 | 60.5% | 7.9% |
| Period 8 of 2025-26 | 860 | 65.1% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cambridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 64,016 | 68.5% | 8.4% |
| Greater Anglia | 55,173 | 86.1% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out