GTR at Cambridge North
All trains at Cambridge NorthGTR across BritainEast of England
How this operator is doing here
GTR had 24,225 scheduled stops at Cambridge North in the 13 periods to Period 7 of 2026-27, 42% of the station's total. 68.9% of recorded arrivals came within three minutes and 10.2% of stops were cancelled.
GTR trains at Cambridge North also serve Cambridge (3.6 km south-west, 68.5% on time, 8.4% cancelled), Waterbeach (4.9 km north-east, 68.1% on time, 10.5% cancelled), Foxton (13.6 km south-west, 66.8% on time, 5.1% cancelled), Shepreth (15.0 km south-west, 69.8% on time, 5.1% cancelled), Meldreth (18.1 km south-west, 68.4% on time, 5.1% cancelled) and Ely (19.9 km north, 66.9% on time, 10.7% cancelled), which are the stations on its network closest to Cambridge North.
Within 30 km of here, GTR runs best at St Neots, 27.7 km west (82.3%), and worst at Littleport, 28.5 km north (65.2%).
The busiest GTR station within 30 km of Cambridge North is Cambridge, 3.6 km south-west, with about 176 scheduled stops a day.
GTR at Cambridge North has slipped sharply. 68.9% of stops came within three minutes of the timetable in the latest 13 periods, 13.3 percentage points worse than the 82.2% recorded in the 13 before. Cancellations rose to 10.2% of scheduled stops from 6.9%, which is 3.3 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,818 | 45.1% | 10.3% |
| Period 6 of 2026-27 | 1,859 | 52.8% | 27.4% |
| Period 5 of 2026-27 | 1,765 | 63.3% | 14.4% |
| Period 4 of 2026-27 | 1,921 | 56.0% | 18.6% |
| Period 3 of 2026-27 | 1,749 | 70.3% | 10.1% |
| Period 2 of 2026-27 | 1,935 | 70.6% | 9.0% |
| Period 1 of 2026-27 | 1,968 | 73.3% | 8.9% |
| Period 13 of 2025-26 | 1,975 | 71.4% | 7.3% |
| Period 12 of 2025-26 | 1,937 | 76.2% | 5.5% |
| Period 11 of 2025-26 | 1,898 | 69.3% | 6.0% |
| Period 10 of 2025-26 | 1,512 | 77.4% | 4.4% |
| Period 9 of 2025-26 | 1,944 | 80.6% | 6.9% |
| Period 8 of 2025-26 | 1,944 | 82.1% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cambridge North
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 33,834 | 89.0% | 3.4% |
| CrossCountry | 2 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out