Cambridge North
CMBEast of EnglandManaged by Greater Anglia
How this station is performing
Cambridge North had 58,061 scheduled stops to Period 7 of 2026-27, about 160 a day. 80.9% of recorded arrivals were within three minutes of the timetable and 6.3% of scheduled stops were cancelled.
Cambridge North opened on 21 May 2017, 9 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Cambridge North is the newest; the oldest, Cambridge, opened in 1845.
The nearest stations to Cambridge North are Cambridge (3.6 km south-west), Waterbeach (4.9 km north-east), Shelford (Cambs) (8.5 km south), Whittlesford Parkway (13.5 km south) and Foxton (13.6 km south-west). 3 stations lie within 10 km in all. Of the five, Shelford (Cambs) is the most punctual at 87.7% and Foxton the least at 66.8%, with Cambridge North on 80.9%.
Cambridge North is named after Cambridge, a big city, home to about 123,867 people, but the station stands 3.1 km from its centre.
3 operators call at Cambridge North: Greater Anglia (89.0%, 58% of stops), GTR (68.9%, 42% of stops) and CrossCountry (–, 0% of stops). The operator you travel with matters: Greater Anglia reaches 89.0% within three minutes while GTR manages 68.9%, a gap of 20.1 percentage points.
2 of 3 stations of a similar size in East of England are more punctual than Cambridge North on 80.9%. The comparison group includes Letchworth Garden City (72.5%), Witham (92.4%) and Shoeburyness (85.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 33,834 | 89.0% | 3.4% |
| GTR | 24,225 | 68.9% | 10.2% |
| CrossCountry | 2 | – | – |
Operators with their own page for this station are linked to it.
Late train at Cambridge North? Delay Repay
These operators call at Cambridge North and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,363 | 67.6% | 6.1% |
| Period 6 of 2026-27 | 4,662 | 74.7% | 12.7% |
| Period 5 of 2026-27 | 4,530 | 78.0% | 8.9% |
| Period 4 of 2026-27 | 4,634 | 75.4% | 11.7% |
| Period 3 of 2026-27 | 4,469 | 82.3% | 6.7% |
| Period 2 of 2026-27 | 4,389 | 82.0% | 4.9% |
| Period 1 of 2026-27 | 4,633 | 83.9% | 5.6% |
| Period 13 of 2025-26 | 4,704 | 82.2% | 5.3% |
| Period 12 of 2025-26 | 4,629 | 85.6% | 4.2% |
| Period 11 of 2025-26 | 4,569 | 81.8% | 3.2% |
| Period 10 of 2025-26 | 3,489 | 85.3% | 2.9% |
| Period 9 of 2025-26 | 4,589 | 85.8% | 4.7% |
| Period 8 of 2025-26 | 4,401 | 87.0% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Letchworth Garden City | 57,889 | 72.5% | 8.3% |
| Witham | 58,808 | 92.4% | 1.1% |
| Shoeburyness | 60,301 | 85.6% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out