Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Cambridge North

All trains at Cambridge NorthCrossCountry across BritainEast of England

On time, last 13 periods–Whole station: 80.9%
Cancelled–Whole station: 6.3%
Scheduled stops2Of 58,061 at the station

How this operator is doing here

There are not enough usable records of CrossCountry at Cambridge North to report how punctual it is.

Period by period

75%80%85%90%2023-242024-252025-262026-27
This pageGreat Britain
0%2%4%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

Other operators at Cambridge North

OperatorScheduled stopsWithin 3 minCancelled
Greater Anglia33,83489.0%3.4%
GTR24,22568.9%10.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out