Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Camborne

All trains at CamborneCrossCountry across BritainSouth West

On time, last 13 periods56.6%Whole station: 67.3%
Cancelled12.9%Whole station: 6.4%
Scheduled stops1,333Of 21,280 at the station

How this operator is doing here

CrossCountry had 1,333 scheduled stops at Camborne in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 56.6% of recorded arrivals came within three minutes and 12.9% of stops were cancelled.

CrossCountry trains at Camborne also serve Redruth (5.7 km north-east, 58.9% on time, 14.1% cancelled), Hayle (9.1 km west, 56.5% on time, 12.9% cancelled), St Erth (11.3 km south-west, 54.1% on time, 14.4% cancelled), Truro (17.7 km east, 56.4% on time, 12.9% cancelled), Penzance (19.3 km south-west, 63.5% on time, 14.8% cancelled) and St Austell (38.9 km east, 59.5% on time, 12.2% cancelled), which are the stations on its network closest to Camborne.

The busiest CrossCountry station within 30 km of Camborne is Penzance, 19.3 km south-west, with about 4 scheduled stops a day.

Of the 2 operators with enough records at Camborne, CrossCountry is the least punctual, at 56.6%.

For CrossCountry, Camborne is the 84th best of 99 ranked stations. Its 56.6% here is 6.6 percentage points below the 63.2% across the whole network.

CrossCountry cancels more at Camborne than elsewhere: 12.9% of scheduled stops, against 5.9% across its network and 6.4% for every operator at the station.

Alongside CrossCountry, the other operators at Camborne are Great Western Railway (68.0%, 94% of stops), so passengers here can compare several services.

Period by period

40%60%80%2023-242024-252025-262026-27Period 3 of 2025-26: 68.4%Period 4 of 2025-26: 66.7%Period 5 of 2025-26: 59.6%Period 6 of 2025-26: 65.6%Period 7 of 2025-26: 69.5%Period 8 of 2025-26: 68.8%Period 9 of 2025-26: 55.1%Period 10 of 2025-26: 58.7%Period 11 of 2025-26: 64.1%Period 12 of 2025-26: 61.9%Period 13 of 2025-26: 69.6%Period 1 of 2026-27: 55.4%Period 2 of 2026-27: 50.5%Period 3 of 2026-27: 53.9%Period 4 of 2026-27: 42.7%Period 5 of 2026-27: 38.2%Period 6 of 2026-27: 48.4%Period 7 of 2026-27: 66.7%
This pageGreat Britain
0%10%20%30%Period 3 of 2025-26: 12.0%Period 4 of 2025-26: 7.4%Period 5 of 2025-26: 13.0%Period 6 of 2025-26: 7.0%Period 7 of 2025-26: 2.8%Period 8 of 2025-26: 7.7%Period 9 of 2025-26: 18.8%Period 10 of 2025-26: 30.0%Period 11 of 2025-26: 22.0%Period 12 of 2025-26: 3.0%Period 13 of 2025-26: 6.4%Period 1 of 2026-27: 3.4%Period 2 of 2026-27: 12.5%Period 3 of 2026-27: 7.3%Period 4 of 2026-27: 17.6%Period 5 of 2026-27: 15.2%Period 6 of 2026-27: 12.0%Period 7 of 2026-27: 15.7%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2710866.7%15.7%
Period 6 of 2026-2710848.4%12.0%
Period 5 of 2026-2710538.2%15.2%
Period 4 of 2026-2710842.7%17.6%
Period 3 of 2026-279653.9%7.3%
Period 2 of 2026-2710450.5%12.5%
Period 1 of 2026-2711655.4%3.4%
Period 13 of 2025-2610969.6%6.4%
Period 12 of 2025-2610061.9%3.0%
Period 11 of 2025-2610064.1%22.0%
Period 10 of 2025-269058.7%30.0%
Period 9 of 2025-268555.1%18.8%
Period 8 of 2025-2610468.8%7.7%

Other operators at Camborne

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway19,94768.0%5.9%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out