CrossCountry at Brockenhurst
All trains at BrockenhurstCrossCountry across BritainSouth East
How this operator is doing here
CrossCountry had 5,305 scheduled stops at Brockenhurst in the 13 periods to Period 7 of 2026-27, 8% of the station's total. 62.3% of recorded arrivals came within three minutes and 9.3% of stops were cancelled.
CrossCountry trains at Brockenhurst also serve Totton (12.9 km north-east, – on time, – cancelled), Southampton Central (15.1 km north-east, 60.2% on time, 5.8% cancelled), Southampton Airport Parkway (21.0 km north-east, 60.9% on time, 4.2% cancelled), Bournemouth (22.7 km south-west, 68.1% on time, 8.4% cancelled), Eastleigh (23.0 km north-east, 77.6% on time, 9.7% cancelled) and Winchester (33.0 km north-east, 58.6% on time, 4.1% cancelled), which are the stations on its network closest to Brockenhurst.
Within 30 km of here, CrossCountry runs best at Bournemouth, 22.7 km south-west (68.1%), and worst at Southampton Central, 15.1 km north-east (60.2%).
The busiest CrossCountry station within 30 km of Brockenhurst is Southampton Central, 15.1 km north-east, with about 32 scheduled stops a day.
CrossCountry at Brockenhurst has slipped sharply. 62.3% of stops came within three minutes of the timetable in the latest 13 periods, 12.6 percentage points worse than the 74.9% recorded in the 13 before. Cancellations rose to 9.3% of scheduled stops from 6.5%, which is 2.8 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 735 | 55.3% | 9.7% |
| Period 6 of 2026-27 | 808 | 65.7% | 7.9% |
| Period 5 of 2026-27 | 791 | 64.7% | 8.6% |
| Period 4 of 2026-27 | 794 | 57.5% | 10.5% |
| Period 3 of 2026-27 | 806 | 61.2% | 11.7% |
| Period 2 of 2026-27 | 470 | 55.3% | 11.9% |
| Period 1 of 2026-27 | 141 | 77.2% | 3.5% |
| Period 13 of 2025-26 | 146 | 76.8% | 5.5% |
| Period 12 of 2025-26 | 121 | 74.3% | 6.6% |
| Period 11 of 2025-26 | 128 | 73.3% | 9.4% |
| Period 10 of 2025-26 | 119 | 72.7% | 7.6% |
| Period 9 of 2025-26 | 128 | 54.2% | 6.3% |
| Period 8 of 2025-26 | 118 | 67.5% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Brockenhurst
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 58,020 | 77.8% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out