Mortimer
MORSouth EastManaged by Great Western Railway
How this station is performing
Mortimer had 25,059 scheduled stops to Period 7 of 2026-27, about 69 a day. 86.2% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Mortimer opened on 1 November 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Theale is the oldest (1847) and Reading Green Park the newest (2023), with Mortimer in between.
The nearest stations to Mortimer are Bramley (Hampshire) (5.0 km south), Reading Green Park (6.5 km north), Theale (7.3 km north), Aldermaston (7.8 km north-west) and Reading West (9.7 km north). 5 stations lie within 10 km in all. Of the five, Bramley (Hampshire) is the most punctual at 86.5% and Theale the least at 79.2%, with Mortimer on 86.2%.
Mortimer takes its name from a Village called Mortimer, and the station stands 2.0 km from its centre.
For Mortimer, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 80.1% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 95.1%, which is 15.0 percentage points higher. Cancellations peaked at 8.7% of scheduled stops in Period 4 of 2025-26, against 3.7% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Mortimer on 86.2%. The comparison group includes Reading Green Park (86.0%), Bramley (Hampshire) (86.5%) and Epsom Downs (92.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 25,059 | 86.2% | 3.7% |
Operators with their own page for this station are linked to it.
Late train at Mortimer? Delay Repay
These operators call at Mortimer and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,891 | 83.5% | 2.5% |
| Period 6 of 2026-27 | 1,920 | 80.1% | 3.0% |
| Period 5 of 2026-27 | 1,891 | 80.6% | 4.2% |
| Period 4 of 2026-27 | 1,867 | 82.3% | 4.4% |
| Period 3 of 2026-27 | 1,913 | 85.0% | 6.9% |
| Period 2 of 2026-27 | 1,891 | 86.7% | 4.0% |
| Period 1 of 2026-27 | 2,192 | 90.3% | 2.0% |
| Period 13 of 2025-26 | 2,070 | 91.9% | 2.5% |
| Period 12 of 2025-26 | 1,919 | 91.9% | 3.1% |
| Period 11 of 2025-26 | 1,920 | 90.7% | 2.0% |
| Period 10 of 2025-26 | 1,736 | 88.7% | 4.4% |
| Period 9 of 2025-26 | 1,924 | 83.1% | 6.0% |
| Period 8 of 2025-26 | 1,925 | 84.4% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Reading Green Park | 25,059 | 86.0% | 3.7% |
| Bramley (Hampshire) | 25,061 | 86.5% | 3.6% |
| Epsom Downs | 25,097 | 92.6% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out