Bottesford
BTFEast MidlandsManaged by East Midlands Railway
How this station is performing
Bottesford had 9,500 scheduled stops to Period 7 of 2026-27, about 26 a day. 76.6% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Bottesford opened on 15 July 1850, 176 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Thurgarton is the oldest (1846) and Grantham the newest (1852), with Bottesford in between.
The nearest stations to Bottesford are Elton and Orston (4.1 km west), Aslockton (7.0 km west), Bingham (10.5 km west), Grantham (11.1 km south-east) and Thurgarton (14.6 km north-west). 2 stations lie within 10 km in all. Of the five, Elton and Orston is the most punctual at 87.1% and Grantham the least at 64.8%, with Bottesford on 76.6%.
Bottesford is one of 2 stations named after a Village called Bottesford, home to about 3,687 people; this one stands 0.9 km from its centre.
For Bottesford, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 55.7% of stops arrived within three minutes of the timetable. The strongest was Period 11 of 2025-26, at 87.9%, which is 32.2 percentage points higher. Cancellations peaked at 6.5% of scheduled stops in Period 8 of 2023-24, against 2.1% over the latest 13 periods.
2 of 3 stations of a similar size in East Midlands are more punctual than Bottesford on 76.6%. The comparison group includes Metheringham (84.5%), Ruskington (84.7%) and Aslockton (71.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 9,500 | 76.6% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Bottesford? Delay Repay
These operators call at Bottesford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 726 | 72.5% | 1.4% |
| Period 6 of 2026-27 | 727 | 55.7% | 1.9% |
| Period 5 of 2026-27 | 726 | 63.7% | 2.9% |
| Period 4 of 2026-27 | 726 | 72.8% | 2.8% |
| Period 3 of 2026-27 | 725 | 69.8% | 4.7% |
| Period 2 of 2026-27 | 728 | 79.5% | 1.5% |
| Period 1 of 2026-27 | 835 | 86.0% | 0.8% |
| Period 13 of 2025-26 | 803 | 86.7% | 2.0% |
| Period 12 of 2025-26 | 728 | 84.6% | 0.7% |
| Period 11 of 2025-26 | 719 | 87.9% | 2.9% |
| Period 10 of 2025-26 | 666 | 82.5% | 2.3% |
| Period 9 of 2025-26 | 687 | 73.0% | 1.9% |
| Period 8 of 2025-26 | 704 | 78.6% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Metheringham | 9,300 | 84.5% | 1.6% |
| Ruskington | 9,300 | 84.7% | 1.6% |
| Aslockton | 9,246 | 71.4% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out