Metheringham
MGMEast MidlandsManaged by East Midlands Railway
How this station is performing
Metheringham had 9,300 scheduled stops to Period 7 of 2026-27, about 26 a day. 84.5% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Metheringham opened on 1 August 1882 and closed to passengers on 11 September 1961. It reopened on 6 October 1975, 51 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Metheringham is the newest; the oldest, Lincoln, opened in 1848.
Metheringham is remote: its nearest neighbours are Ruskington (10.8 km south), Lincoln (13.9 km north-west), Hykeham (15.2 km north-west), Sleaford (16.0 km south) and Rauceby (17.6 km south). Of the five, Lincoln is the most punctual at 87.8% and Rauceby the least at 76.0%, with Metheringham on 84.5%.
Metheringham takes its name from a Village called Metheringham, home to about 3,605 people, and the station stands 0.8 km from its centre.
For Metheringham, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 68.1% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2025-26, at 92.1%, which is 24.0 percentage points higher. Cancellations peaked at 9.4% of scheduled stops in Period 8 of 2023-24, against 1.6% over the latest 13 periods.
1 of 3 stations of a similar size in East Midlands are more punctual than Metheringham on 84.5%. The comparison group includes Ruskington (84.7%), Aslockton (71.4%) and Spalding (84.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 9,300 | 84.5% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Metheringham? Delay Repay
These operators call at Metheringham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 719 | 76.4% | 0.3% |
| Period 6 of 2026-27 | 720 | 68.1% | 0.4% |
| Period 5 of 2026-27 | 724 | 81.8% | 2.2% |
| Period 4 of 2026-27 | 719 | 85.7% | 2.8% |
| Period 3 of 2026-27 | 710 | 86.3% | 2.1% |
| Period 2 of 2026-27 | 724 | 90.5% | 3.6% |
| Period 1 of 2026-27 | 841 | 89.9% | 1.5% |
| Period 13 of 2025-26 | 778 | 91.6% | 1.8% |
| Period 12 of 2025-26 | 720 | 92.1% | 0.0% |
| Period 11 of 2025-26 | 709 | 91.2% | 0.4% |
| Period 10 of 2025-26 | 636 | 89.1% | 0.6% |
| Period 9 of 2025-26 | 652 | 75.1% | 4.4% |
| Period 8 of 2025-26 | 648 | 77.9% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ruskington | 9,300 | 84.7% | 1.6% |
| Aslockton | 9,246 | 71.4% | 2.1% |
| Spalding | 9,153 | 84.3% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out