Aslockton
ALKEast MidlandsManaged by East Midlands Railway
How this station is performing
Aslockton had 9,246 scheduled stops to Period 7 of 2026-27, about 25 a day. 71.4% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Aslockton opened on 15 July 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Aslockton is the newest; the oldest, Lowdham, opened in 1846.
The nearest stations to Aslockton are Elton and Orston (2.9 km east), Bingham (3.5 km west), Bottesford (7.0 km east), Lowdham (9.1 km north-west) and Radcliffe (Nottinghamshire) (9.3 km west). 6 stations lie within 10 km in all. At 71.4%, Aslockton is less punctual than all of them; the best of the five, Elton and Orston, manages 87.1%.
Aslockton takes its name from a Village called Aslockton, home to about 1,937 people, and the station stands 0.2 km from its centre.
Aslockton has slipped sharply. 71.4% of stops came within three minutes of the timetable in the latest 13 periods, 8.2 percentage points worse than the 79.6% recorded in the 13 before. Cancellations held steady at 2.1% of scheduled stops, against 2.5% before.
Compared with 3 stations of a similar size in East Midlands, Aslockton is the least punctual, at 71.4%. All of them are ahead, including Metheringham (84.5%), Ruskington (84.7%) and Spalding (84.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 9,246 | 71.4% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Aslockton? Delay Repay
These operators call at Aslockton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 713 | 71.6% | 1.7% |
| Period 6 of 2026-27 | 715 | 34.0% | 2.2% |
| Period 5 of 2026-27 | 714 | 60.1% | 2.8% |
| Period 4 of 2026-27 | 714 | 69.6% | 2.7% |
| Period 3 of 2026-27 | 712 | 66.1% | 4.8% |
| Period 2 of 2026-27 | 716 | 77.8% | 2.4% |
| Period 1 of 2026-27 | 819 | 83.7% | 0.5% |
| Period 13 of 2025-26 | 792 | 91.0% | 1.4% |
| Period 12 of 2025-26 | 716 | 86.3% | 1.0% |
| Period 11 of 2025-26 | 707 | 90.2% | 2.8% |
| Period 10 of 2025-26 | 644 | 80.4% | 2.3% |
| Period 9 of 2025-26 | 632 | 71.6% | 2.4% |
| Period 8 of 2025-26 | 652 | 78.9% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Metheringham | 9,300 | 84.5% | 1.6% |
| Ruskington | 9,300 | 84.7% | 1.6% |
| Spalding | 9,153 | 84.3% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out