Ruskington
RKTEast MidlandsManaged by East Midlands Railway
How this station is performing
Ruskington had 9,300 scheduled stops to Period 7 of 2026-27, about 26 a day. 84.7% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Ruskington opened on 6 March 1882 and closed to passengers on 11 September 1961. It reopened on 5 May 1975, 51 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Ruskington is the newest; the oldest, Sleaford, opened in 1857.
The nearest stations to Ruskington are Sleaford (5.5 km south), Rauceby (8.1 km south-west), Heckington (9.2 km south-east), Metheringham (10.8 km north) and Ancaster (12.0 km south-west). 3 stations lie within 10 km in all. At 84.7%, Ruskington is more punctual than every one of them; the best of the five, Metheringham, manages 84.5%.
Ruskington takes its name from a Village called Ruskington, home to about 5,648 people, and the station stands 0.6 km from its centre.
For Ruskington, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 70.3% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2025-26, at 91.5%, which is 21.2 percentage points higher. Cancellations peaked at 9.4% of scheduled stops in Period 8 of 2023-24, against 1.6% over the latest 13 periods.
Compared with 3 stations of a similar size in East Midlands, Ruskington is the most punctual, at 84.7%. The comparison group includes Metheringham (84.5%), Aslockton (71.4%) and Spalding (84.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 9,300 | 84.7% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Ruskington? Delay Repay
These operators call at Ruskington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 719 | 78.8% | 0.3% |
| Period 6 of 2026-27 | 720 | 70.3% | 0.4% |
| Period 5 of 2026-27 | 724 | 81.5% | 2.2% |
| Period 4 of 2026-27 | 719 | 86.8% | 2.8% |
| Period 3 of 2026-27 | 710 | 86.6% | 2.1% |
| Period 2 of 2026-27 | 724 | 89.7% | 3.6% |
| Period 1 of 2026-27 | 841 | 90.0% | 1.5% |
| Period 13 of 2025-26 | 778 | 91.2% | 1.8% |
| Period 12 of 2025-26 | 720 | 91.5% | 0.0% |
| Period 11 of 2025-26 | 709 | 90.2% | 0.4% |
| Period 10 of 2025-26 | 636 | 88.1% | 0.8% |
| Period 9 of 2025-26 | 652 | 75.4% | 4.4% |
| Period 8 of 2025-26 | 648 | 79.1% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Metheringham | 9,300 | 84.5% | 1.6% |
| Aslockton | 9,246 | 71.4% | 2.1% |
| Spalding | 9,153 | 84.3% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out