How this operator is doing here
Chiltern Railways had 24,324 scheduled stops at Birmingham Moor Street in the 13 periods to Period 7 of 2026-27, 36% of the station's total. 85.8% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
Chiltern Railways trains at Birmingham Moor Street also serve Birmingham Snow Hill (0.7 km north-west, 85.4% on time, 3.2% cancelled), Bordesley (1.3 km south-east, – on time, – cancelled), Jewellery Quarter (1.8 km north-west, – on time, – cancelled), The Hawthorns (5.7 km north-west, – on time, – cancelled), Acocks Green (6.0 km south-east, – on time, – cancelled) and Smethwick Galton Bridge (6.5 km north-west, – on time, – cancelled), which are the stations on its network closest to Birmingham Moor Street.
Within 30 km of here, Chiltern Railways runs best at Wilmcote, 30.0 km south (91.0%), and worst at Lapworth, 19.0 km south-east (82.4%).
The busiest Chiltern Railways station within 30 km of Birmingham Moor Street is Solihull, 10.0 km south-east, with about 67 scheduled stops a day.
Of the 2 operators with enough records at Birmingham Moor Street, Chiltern Railways is the least punctual, at 85.8%.
For Chiltern Railways, Birmingham Moor Street is the 34th best of 51 ranked stations. Its 85.8% here is 1.9 percentage points below the 87.7% across the whole network.
Period by period
See how Chiltern Railways Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,862 | 83.7% | 0.5% |
| Period 6 of 2026-27 | 1,827 | 82.5% | 1.0% |
| Period 5 of 2026-27 | 1,808 | 80.7% | 1.5% |
| Period 4 of 2026-27 | 1,847 | 79.5% | 2.7% |
| Period 3 of 2026-27 | 1,833 | 83.1% | 1.2% |
| Period 2 of 2026-27 | 1,903 | 85.9% | 1.1% |
| Period 1 of 2026-27 | 2,146 | 90.5% | 0.8% |
| Period 13 of 2025-26 | 1,984 | 89.9% | 1.7% |
| Period 12 of 2025-26 | 1,833 | 90.2% | 0.5% |
| Period 11 of 2025-26 | 1,849 | 89.7% | 1.5% |
| Period 10 of 2025-26 | 1,714 | 86.8% | 0.5% |
| Period 9 of 2025-26 | 1,799 | 86.6% | 1.9% |
| Period 8 of 2025-26 | 1,919 | 85.3% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Birmingham Moor Street
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 42,962 | 89.0% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out