Birmingham Moor Street
BMOWest MidlandsManaged by Chiltern Railways
How this station is performing
Birmingham Moor Street had 67,286 scheduled stops to Period 7 of 2026-27, about 185 a day. 87.8% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Birmingham Moor Street opened on 1 July 1909. It was moved to the site it uses now on 5 October 1987. Of the 5 stations nearest to it with a known opening date, Birmingham Moor Street is the newest; the oldest, Birmingham Snow Hill, opened in 1852.
The nearest stations to Birmingham Moor Street are Birmingham New Street (0.4 km west), Birmingham Snow Hill (0.7 km north-west), Bordesley (1.3 km south-east), Five Ways (1.7 km south-west) and Duddeston (1.8 km north-east). 38 stations lie within 10 km in all. At 87.8%, Birmingham Moor Street is more punctual than every one of them; the best of the five, Birmingham Snow Hill, manages 86.8%.
Birmingham Moor Street is named after Birmingham, a college town, home to about 1,137,100 people, but the station stands 0.7 km from its centre.
2 operators call at Birmingham Moor Street: West Midlands Railway (89.0%, 64% of stops) and Chiltern Railways (85.8%, 36% of stops). They are close together, with West Midlands Railway leading on 89.0% and Chiltern Railways trailing on 85.8%, a gap of 3.2 percentage points.
1 of 3 stations of a similar size in West Midlands are more punctual than Birmingham Moor Street on 87.8%. The comparison group includes Shrewsbury (76.7%), Rugby (62.9%) and Stourbridge Town (100.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 42,962 | 89.0% | 3.5% |
| Chiltern Railways | 24,324 | 85.8% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Birmingham Moor Street? Delay Repay
These operators call at Birmingham Moor Street and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,246 | 85.1% | 1.5% |
| Period 6 of 2026-27 | 5,211 | 86.3% | 2.0% |
| Period 5 of 2026-27 | 4,421 | 84.3% | 4.7% |
| Period 4 of 2026-27 | 4,961 | 83.3% | 3.7% |
| Period 3 of 2026-27 | 5,099 | 86.0% | 2.9% |
| Period 2 of 2026-27 | 5,022 | 87.3% | 2.5% |
| Period 1 of 2026-27 | 6,059 | 91.1% | 2.2% |
| Period 13 of 2025-26 | 5,685 | 91.6% | 3.0% |
| Period 12 of 2025-26 | 5,217 | 92.0% | 1.5% |
| Period 11 of 2025-26 | 5,145 | 90.8% | 2.6% |
| Period 10 of 2025-26 | 4,738 | 88.2% | 2.6% |
| Period 9 of 2025-26 | 5,182 | 86.6% | 2.8% |
| Period 8 of 2025-26 | 5,300 | 87.1% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Shrewsbury | 69,099 | 76.7% | 2.8% |
| Rugby | 65,000 | 62.9% | 4.3% |
| Stourbridge Town | 70,554 | 100.0% | 1.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out