Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Shrewsbury

SHRWest MidlandsManaged by TfW Rail

On time, last 13 periods76.7%Great Britain: 83.6%
Cancelled2.8%Great Britain: 3.2%
Stops a day190Scheduled, on average
Punctuality rank1750th of 2,374Among ranked stations

How this station is performing

Shrewsbury had 69,099 scheduled stops to Period 7 of 2026-27, about 190 a day. 76.7% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.

Shrewsbury opened on 14 October 1848. It was moved to the site it uses now on 1 June 1849. Of the 5 stations nearest to it with a known opening date, Shrewsbury is the oldest; the next oldest, Wellington (Shropshire), dates from 1849.

Shrewsbury is remote: its nearest neighbours are Yorton (10.8 km north), Wellington (Shropshire) (15.7 km east), Wem (16.2 km north), Church Stretton (19.8 km south) and Oakengates (20.3 km east). Of the five, Yorton is the most punctual at 86.0% and Church Stretton the least at 66.4%, with Shrewsbury on 76.7%.

Shrewsbury takes its name from a county town called Shrewsbury, home to about 76,802 people, and the station stands 0.5 km from its centre.

2 operators call at Shrewsbury: Transport for Wales (73.6%, 68% of stops) and West Midlands Railway (83.5%, 32% of stops). The operator you travel with matters: West Midlands Railway reaches 83.5% within three minutes while Transport for Wales manages 73.6%, a gap of 9.9 percentage points.

Compared with 3 stations of a similar size in West Midlands, Shrewsbury is the least punctual, at 76.7%. All of them are ahead, including Stourbridge Town (100.0%), Aston (84.6%) and Birmingham Moor Street (87.8%).

Period by period

50%60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 72.1%Period 2 of 2023-24: 67.4%Period 3 of 2023-24: 64.1%Period 4 of 2023-24: 66.0%Period 5 of 2023-24: 65.5%Period 6 of 2023-24: 67.4%Period 7 of 2023-24: 66.4%Period 8 of 2023-24: 59.8%Period 9 of 2023-24: 54.5%Period 10 of 2023-24: 67.9%Period 11 of 2023-24: 74.6%Period 12 of 2023-24: 75.7%Period 13 of 2023-24: 78.4%Period 1 of 2024-25: 75.8%Period 2 of 2024-25: 74.3%Period 3 of 2024-25: 76.8%Period 4 of 2024-25: 75.5%Period 5 of 2024-25: 73.9%Period 6 of 2024-25: 75.6%Period 7 of 2024-25: 72.3%Period 8 of 2024-25: 64.5%Period 9 of 2024-25: 66.0%Period 10 of 2024-25: 73.5%Period 11 of 2024-25: 76.9%Period 12 of 2024-25: 84.6%Period 13 of 2024-25: 83.8%Period 1 of 2025-26: 81.9%Period 2 of 2025-26: 76.0%Period 3 of 2025-26: 79.9%Period 4 of 2025-26: 76.6%Period 5 of 2025-26: 78.0%Period 6 of 2025-26: 81.9%Period 7 of 2025-26: 75.4%Period 8 of 2025-26: 73.0%Period 9 of 2025-26: 67.3%Period 10 of 2025-26: 78.1%Period 11 of 2025-26: 81.7%Period 12 of 2025-26: 83.5%Period 13 of 2025-26: 83.3%Period 1 of 2026-27: 82.3%Period 2 of 2026-27: 77.5%Period 3 of 2026-27: 78.8%Period 4 of 2026-27: 72.8%Period 5 of 2026-27: 69.4%Period 6 of 2026-27: 73.5%Period 7 of 2026-27: 74.5%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 4.6%Period 2 of 2023-24: 3.4%Period 3 of 2023-24: 4.6%Period 4 of 2023-24: 4.2%Period 5 of 2023-24: 4.3%Period 6 of 2023-24: 2.3%Period 7 of 2023-24: 3.2%Period 8 of 2023-24: 5.5%Period 9 of 2023-24: 3.0%Period 10 of 2023-24: 5.0%Period 11 of 2023-24: 1.6%Period 12 of 2023-24: 2.7%Period 13 of 2023-24: 2.7%Period 1 of 2024-25: 2.4%Period 2 of 2024-25: 2.5%Period 3 of 2024-25: 2.4%Period 4 of 2024-25: 3.8%Period 5 of 2024-25: 4.0%Period 6 of 2024-25: 3.1%Period 7 of 2024-25: 6.6%Period 8 of 2024-25: 7.7%Period 9 of 2024-25: 8.4%Period 10 of 2024-25: 8.2%Period 11 of 2024-25: 2.3%Period 12 of 2024-25: 1.7%Period 13 of 2024-25: 1.7%Period 1 of 2025-26: 2.5%Period 2 of 2025-26: 4.7%Period 3 of 2025-26: 2.3%Period 4 of 2025-26: 2.3%Period 5 of 2025-26: 2.0%Period 6 of 2025-26: 1.5%Period 7 of 2025-26: 2.5%Period 8 of 2025-26: 2.5%Period 9 of 2025-26: 2.6%Period 10 of 2025-26: 2.6%Period 11 of 2025-26: 5.0%Period 12 of 2025-26: 1.3%Period 13 of 2025-26: 2.1%Period 1 of 2026-27: 1.7%Period 2 of 2026-27: 6.0%Period 3 of 2026-27: 2.0%Period 4 of 2026-27: 3.6%Period 5 of 2026-27: 3.8%Period 6 of 2026-27: 2.6%Period 7 of 2026-27: 1.5%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Transport for Wales46,96773.6%2.3%
West Midlands Railway22,13283.5%3.9%

Operators with their own page for this station are linked to it.

Late train at Shrewsbury? Delay Repay

These operators call at Shrewsbury and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275,28674.5%1.5%
Period 6 of 2026-275,25373.5%2.6%
Period 5 of 2026-275,20369.4%3.8%
Period 4 of 2026-274,94672.8%3.6%
Period 3 of 2026-275,23878.8%2.0%
Period 2 of 2026-275,14277.5%6.0%
Period 1 of 2026-276,13282.3%1.7%
Period 13 of 2025-265,84583.3%2.1%
Period 12 of 2025-265,28983.5%1.3%
Period 11 of 2025-265,18781.7%5.0%
Period 10 of 2025-264,90978.1%2.6%
Period 9 of 2025-265,32067.3%2.6%
Period 8 of 2025-265,34973.0%2.5%

Time of year

60%70%80%90%P1: 78.4%1P2: 74.0%2P3: 75.3%3P4: 73.0%4P5: 72.0%5P6: 74.9%6P7: 72.4%7P8: 66.0%8P9: 62.8%9P10: 73.5%10P11: 77.8%11P12: 81.5%12P13: 82.2%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in West Midlands

StationScheduled stopsWithin 3 minCancelled
Stourbridge Town70,554100.0%1.1%
Aston70,65584.6%2.5%
Birmingham Moor Street67,28687.8%2.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out