Merseyrail at Bidston
How this operator is doing here
Merseyrail had 40,363 scheduled stops at Bidston in the 13 periods to Period 7 of 2026-27, 75% of the station's total. 89.1% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
Merseyrail trains at Bidston also serve Leasowe (1.4 km west, 72.4% on time, 1.7% cancelled), Birkenhead North (1.5 km east, 91.6% on time, 1.5% cancelled), Wallasey Village (1.7 km north, – on time, 1.5% cancelled), Wallasey Grove Road (2.2 km north, 99.3% on time, 1.5% cancelled), Moreton (Merseyside) (2.3 km west, 87.0% on time, 1.7% cancelled) and Birkenhead Park (2.9 km south-east, 89.8% on time, 1.9% cancelled), which are the stations on its network closest to Bidston.
Within 30 km of here, Merseyrail runs best at Wallasey Grove Road, 2.2 km north (99.3%), and worst at Leasowe, 1.4 km west (72.4%).
The busiest Merseyrail station within 30 km of Bidston is Liverpool Central, 6.6 km east, with about 582 scheduled stops a day.
Of the 2 operators with enough records at Bidston, Merseyrail is the most punctual, at 89.1%.
For Merseyrail, Bidston is the 50th best of 62 ranked stations. Its 89.1% here is 2.4 percentage points below the 91.5% across the whole network.
Merseyrail at Bidston has slipped a little, from 91.1% within three minutes in the previous 13 periods to 89.1% in the latest 13, a fall of 2.0 percentage points. Cancellations held steady at 1.7% of scheduled stops, against 2.0% before.
Period by period
See how Merseyrail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,084 | 90.3% | 1.1% |
| Period 6 of 2026-27 | 3,084 | 90.5% | 2.5% |
| Period 5 of 2026-27 | 3,084 | 89.4% | 2.7% |
| Period 4 of 2026-27 | 2,903 | 88.8% | 1.7% |
| Period 3 of 2026-27 | 3,084 | 90.3% | 1.8% |
| Period 2 of 2026-27 | 3,084 | 87.5% | 1.2% |
| Period 1 of 2026-27 | 3,556 | 90.5% | 1.7% |
| Period 13 of 2025-26 | 3,384 | 91.4% | 0.7% |
| Period 12 of 2025-26 | 3,084 | 89.9% | 2.6% |
| Period 11 of 2025-26 | 3,084 | 91.8% | 1.1% |
| Period 10 of 2025-26 | 2,757 | 86.4% | 1.3% |
| Period 9 of 2025-26 | 3,083 | 82.4% | 2.4% |
| Period 8 of 2025-26 | 3,092 | 88.6% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bidston
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 13,328 | 87.3% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out