How this operator is doing here
Transport for Wales had 13,328 scheduled stops at Bidston in the 13 periods to Period 7 of 2026-27, 25% of the station's total. 87.3% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
Transport for Wales trains at Bidston also serve Upton (Merseyside) (2.5 km south, 77.1% on time, 4.0% cancelled), Liverpool Lime Street (6.7 km east, 80.7% on time, 3.1% cancelled), Heswall (8.8 km south, 75.6% on time, 4.0% cancelled), Neston (13.1 km south, 76.1% on time, 4.0% cancelled), Liverpool South Parkway (13.8 km south-east, 81.4% on time, 2.9% cancelled) and Flint (18.1 km south, 75.5% on time, 2.0% cancelled), which are the stations on its network closest to Bidston.
Within 30 km of here, Transport for Wales runs best at Runcorn, 23.8 km east (86.2%), and worst at Hawarden Bridge, 21.5 km south (73.6%).
The busiest Transport for Wales station within 30 km of Bidston is Chester, 27.0 km south-east, with about 163 scheduled stops a day.
Of the 2 operators with enough records at Bidston, Transport for Wales is the least punctual, at 87.3%.
Transport for Wales at Bidston has not moved in one direction over three full railway years: 67.8% within three minutes in 2023-24, 87.3% in 2024-25 and 86.5% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,068 | 84.6% | 2.9% |
| Period 6 of 2026-27 | 778 | 83.1% | 4.8% |
| Period 5 of 2026-27 | 801 | 86.5% | 6.5% |
| Period 4 of 2026-27 | 1,068 | 91.0% | 4.8% |
| Period 3 of 2026-27 | 1,068 | 88.5% | 6.4% |
| Period 2 of 2026-27 | 1,068 | 90.2% | 2.1% |
| Period 1 of 2026-27 | 1,232 | 90.4% | 2.4% |
| Period 13 of 2025-26 | 1,171 | 91.8% | 1.5% |
| Period 12 of 2025-26 | 1,068 | 92.9% | 2.4% |
| Period 11 of 2025-26 | 1,000 | 88.4% | 3.8% |
| Period 10 of 2025-26 | 972 | 83.1% | 6.5% |
| Period 9 of 2025-26 | 1,012 | 79.4% | 3.6% |
| Period 8 of 2025-26 | 1,022 | 81.3% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bidston
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 40,363 | 89.1% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out