Bidston
BIDNorth WestManaged by Merseyrail
How this station is performing
Bidston had 53,691 scheduled stops to Period 7 of 2026-27, about 148 a day. 88.7% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Bidston first opened on 2 July 1866. The station passengers use today opened on 18 May 1896, 130 years ago. Of the 5 stations nearest to it with a known opening date, Bidston is the oldest; the next oldest, Moreton (Merseyside), dates from 1866.
The nearest stations to Bidston are Leasowe (1.4 km west), Birkenhead North (1.5 km east), Wallasey Village (1.7 km north), Wallasey Grove Road (2.2 km north) and Moreton (Merseyside) (2.3 km west). 39 stations lie within 10 km in all. Of the five, Wallasey Grove Road is the most punctual at 99.3% and Leasowe the least at 72.4%, with Bidston on 88.7%.
Bidston takes its name from a Village called Bidston, home to about 15,216 people, and the station stands 0.8 km from its centre.
2 operators call at Bidston: Merseyrail (89.1%, 75% of stops) and Transport for Wales (87.3%, 25% of stops). They are close together, with Merseyrail leading on 89.1% and Transport for Wales trailing on 87.3%, a gap of 1.8 percentage points.
1 of 3 stations of a similar size in North West are more punctual than Bidston on 88.7%. The comparison group includes Ormskirk (94.1%), Salford Central (78.5%) and Wilmslow (72.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 40,363 | 89.1% | 1.7% |
| Transport for Wales | 13,328 | 87.3% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Bidston? Delay Repay
These operators call at Bidston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,152 | 88.9% | 1.6% |
| Period 6 of 2026-27 | 3,862 | 89.0% | 3.0% |
| Period 5 of 2026-27 | 3,885 | 88.8% | 3.5% |
| Period 4 of 2026-27 | 3,971 | 89.3% | 2.5% |
| Period 3 of 2026-27 | 4,152 | 89.8% | 2.9% |
| Period 2 of 2026-27 | 4,152 | 88.2% | 1.4% |
| Period 1 of 2026-27 | 4,788 | 90.4% | 1.8% |
| Period 13 of 2025-26 | 4,555 | 91.5% | 0.9% |
| Period 12 of 2025-26 | 4,152 | 90.7% | 2.6% |
| Period 11 of 2025-26 | 4,084 | 91.0% | 1.8% |
| Period 10 of 2025-26 | 3,729 | 85.5% | 2.7% |
| Period 9 of 2025-26 | 4,095 | 81.7% | 2.7% |
| Period 8 of 2025-26 | 4,114 | 86.8% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ormskirk | 53,564 | 94.1% | 2.0% |
| Salford Central | 52,928 | 78.5% | 3.0% |
| Wilmslow | 55,192 | 72.6% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out