Claygate
CLGSouth EastManaged by South Western Railway
How this station is performing
Claygate had 23,622 scheduled stops to Period 7 of 2026-27, about 65 a day. 84.8% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Claygate opened on 2 February 1885, 141 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Esher is the oldest (1838) and Chessington South the newest (1939), with Claygate in between.
The nearest stations to Claygate are Hinchley Wood (1.7 km north), Esher (2.2 km north), Chessington South (2.8 km east), Oxshott (2.9 km south) and Thames Ditton (3.2 km north). 46 stations lie within 10 km in all. Of the five, Thames Ditton is the most punctual at 88.5% and Esher the least at 80.1%, with Claygate on 84.8%.
Claygate takes its name from a Village called Claygate, home to about 7,263 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Claygate was Period 9 of 2024-25, at 68.2%, some time before the latest year. The strongest was Period 5 of 2023-24, at 94.9%, and the two are 26.7 percentage points apart. Cancellations peaked at 6.3% of scheduled stops in Period 2 of 2026-27, against 3.0% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Claygate on 84.8%. The comparison group includes Cobham and Stoke D'abernon (85.6%), Hinchley Wood (84.7%) and Oxshott (85.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 23,622 | 84.8% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Claygate? Delay Repay
These operators call at Claygate and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,834 | 89.7% | 1.8% |
| Period 6 of 2026-27 | 1,780 | 88.0% | 1.7% |
| Period 5 of 2026-27 | 1,678 | 89.1% | 5.2% |
| Period 4 of 2026-27 | 1,887 | 89.6% | 1.5% |
| Period 3 of 2026-27 | 1,780 | 88.2% | 4.3% |
| Period 2 of 2026-27 | 1,827 | 82.5% | 6.3% |
| Period 1 of 2026-27 | 2,133 | 88.3% | 1.9% |
| Period 13 of 2025-26 | 1,825 | 88.5% | 1.2% |
| Period 12 of 2025-26 | 1,850 | 78.8% | 2.7% |
| Period 11 of 2025-26 | 1,854 | 83.8% | 1.3% |
| Period 10 of 2025-26 | 1,528 | 82.4% | 4.6% |
| Period 9 of 2025-26 | 1,796 | 73.9% | 2.0% |
| Period 8 of 2025-26 | 1,850 | 78.6% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cobham and Stoke D'abernon | 23,622 | 85.6% | 3.0% |
| Hinchley Wood | 23,622 | 84.7% | 3.0% |
| Oxshott | 23,622 | 85.3% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out