Berwick (Sussex)
BRKSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Berwick (Sussex) had 17,502 scheduled stops to Period 7 of 2026-27, about 48 a day. 85.1% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Berwick (Sussex) opened on 27 June 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Berwick (Sussex) is the oldest; the next oldest, Polegate, dates from 1846.
The nearest stations to Berwick (Sussex) are Polegate (6.1 km east), Glynde (7.0 km west), Seaford (Sussex) (8.8 km south-west), Bishopstone (Sussex) (8.9 km south-west) and Newhaven Town (9.3 km south-west). 8 stations lie within 10 km in all. Of the five, Bishopstone (Sussex) is the most punctual at 87.8% and Polegate the least at 78.6%, with Berwick (Sussex) on 85.1%.
Berwick (Sussex) is named after Berwick, a Village, home to about 380 people, but the station stands 1.6 km from its centre.
Berwick (Sussex) has slipped sharply. 85.1% of stops came within three minutes of the timetable in the latest 13 periods, 5.9 percentage points worse than the 91.0% recorded in the 13 before. Cancellations rose to 2.1% of scheduled stops from 1.4%, which is 0.7 percentage points more.
Compared with 3 stations of a similar size in South East, Berwick (Sussex) is the most punctual, at 85.1%. The comparison group includes Liphook (77.5%), Liss (78.9%) and Chestfield and Swalecliffe (78.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 17,502 | 85.1% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Berwick (Sussex)? Delay Repay
These operators call at Berwick (Sussex) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,311 | 74.6% | 3.9% |
| Period 6 of 2026-27 | 1,300 | 54.7% | 1.6% |
| Period 5 of 2026-27 | 1,129 | 82.5% | 3.1% |
| Period 4 of 2026-27 | 1,364 | 87.9% | 2.8% |
| Period 3 of 2026-27 | 1,405 | 86.2% | 4.1% |
| Period 2 of 2026-27 | 1,358 | 85.6% | 2.6% |
| Period 1 of 2026-27 | 1,544 | 92.0% | 2.1% |
| Period 13 of 2025-26 | 1,507 | 92.2% | 1.2% |
| Period 12 of 2025-26 | 1,394 | 91.4% | 1.1% |
| Period 11 of 2025-26 | 1,378 | 88.5% | 1.2% |
| Period 10 of 2025-26 | 1,089 | 90.3% | 0.6% |
| Period 9 of 2025-26 | 1,371 | 88.1% | 0.8% |
| Period 8 of 2025-26 | 1,352 | 89.3% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Liphook | 17,455 | 77.5% | 3.3% |
| Liss | 17,455 | 78.9% | 3.3% |
| Chestfield and Swalecliffe | 17,443 | 78.8% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out