West Midlands Railway at Bedford
All trains at BedfordWest Midlands Railway across BritainEast of England
How this operator is doing here
West Midlands Railway had 10,299 scheduled stops at Bedford in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 92.1% of recorded arrivals came within three minutes and 7.6% of stops were cancelled.
West Midlands Railway trains at Bedford also serve Bedford St Johns (1.1 km south-east, 89.5% on time, 7.5% cancelled), Kempston Hardwick (5.2 km south, 93.2% on time, 7.5% cancelled), Stewartby (8.0 km south, 92.5% on time, 7.5% cancelled), Millbrook (Bedfordshire) (9.8 km south, – on time, 7.5% cancelled), Lidlington (11.9 km south-west, 93.9% on time, 7.5% cancelled) and Ridgmont (14.5 km south-west, 93.3% on time, 7.4% cancelled), which are the stations on its network closest to Bedford.
Within 30 km of here, West Midlands Railway runs best at Bow Brickhill, 20.9 km south-west (94.8%), and worst at Milton Keynes Central, 23.1 km south-west (71.7%).
The busiest West Midlands Railway station within 30 km of Bedford is Milton Keynes Central, 23.1 km south-west, with about 171 scheduled stops a day.
Of the 3 operators with enough records at Bedford, West Midlands Railway is the most punctual, at 92.1%.
For West Midlands Railway, Bedford is the 22nd best of 169 ranked stations. Its 92.1% here is 11.0 percentage points above the 81.1% across the whole network.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 816 | 93.2% | 3.9% |
| Period 6 of 2026-27 | 759 | 91.3% | 17.1% |
| Period 5 of 2026-27 | 690 | 93.0% | 19.0% |
| Period 4 of 2026-27 | 708 | 94.4% | 9.6% |
| Period 3 of 2026-27 | 816 | 92.2% | 9.2% |
| Period 2 of 2026-27 | 748 | 91.0% | 6.0% |
| Period 1 of 2026-27 | 918 | 93.3% | 9.9% |
| Period 13 of 2025-26 | 884 | 91.2% | 4.5% |
| Period 12 of 2025-26 | 816 | 92.7% | 3.2% |
| Period 11 of 2025-26 | 816 | 89.0% | 3.8% |
| Period 10 of 2025-26 | 696 | 91.0% | 4.2% |
| Period 9 of 2025-26 | 816 | 93.1% | 5.4% |
| Period 8 of 2025-26 | 816 | 92.5% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bedford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 56,385 | 85.1% | 4.9% |
| East Midlands Railway | 25,860 | 76.2% | 6.3% |
| LNER | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out