GTR had 56,385 scheduled stops at Bedford in the 13 periods to Period 7 of 2026-27, 61% of the station's total. 85.1% of recorded arrivals came within three minutes and 4.9% of stops were cancelled.
GTR trains at Bedford also serve Sandy (13.6 km east, 84.9% on time, 6.0% cancelled), Flitwick (14.8 km south, 83.8% on time, 6.0% cancelled), Biggleswade (16.0 km east, 84.4% on time, 6.0% cancelled), Arlesey (19.0 km south-east, 85.6% on time, 6.3% cancelled), St Neots (19.0 km north-east, 82.3% on time, 5.9% cancelled) and Harlington (Bedfordshire) (19.5 km south, 84.6% on time, 6.1% cancelled), which are the stations on its network closest to Bedford.
Within 30 km of here, GTR runs best at Arlesey, 19.0 km south-east (85.6%), and worst at Letchworth Garden City, 24.3 km south-east (72.5%).
The busiest GTR station within 30 km of Bedford is Luton, 28.6 km south, with about 221 scheduled stops a day.
GTR ranks 2nd of the 3 operators with enough records at Bedford, on 85.1%.
For GTR, Bedford is the 125th best of 307 ranked stations. Its 85.1% here is 2.2 percentage points above the 82.9% across the whole network.
GTR at Bedford has edged up: 85.1% of stops came within three minutes of the timetable in the latest 13 periods, 1.9 percentage points better than the 83.2% of the 13 before. Cancellations fell to 4.9% of scheduled stops from 7.3%, which is 2.4 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,529 | 84.3% | 2.8% |
| Period 6 of 2026-27 | 4,400 | 81.9% | 5.6% |
| Period 5 of 2026-27 | 4,350 | 81.4% | 8.0% |
| Period 4 of 2026-27 | 4,336 | 81.9% | 6.8% |
| Period 3 of 2026-27 | 3,140 | 87.5% | 3.5% |
| Period 2 of 2026-27 | 3,976 | 88.7% | 3.0% |
| Period 1 of 2026-27 | 4,815 | 89.6% | 3.0% |
| Period 13 of 2025-26 | 4,934 | 87.6% | 2.7% |
| Period 12 of 2025-26 | 4,539 | 88.1% | 6.0% |
| Period 11 of 2025-26 | 4,497 | 87.0% | 4.9% |
| Period 10 of 2025-26 | 3,959 | 86.5% | 5.1% |
| Period 9 of 2025-26 | 4,481 | 78.8% | 9.0% |
| Period 8 of 2025-26 | 4,429 | 83.1% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bedford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 25,860 | 76.2% | 6.3% |
| West Midlands Railway | 10,299 | 92.1% | 7.6% |
| LNER | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out