East Midlands Railway at Bedford
All trains at BedfordEast Midlands Railway across BritainEast of England
How this operator is doing here
East Midlands Railway had 25,860 scheduled stops at Bedford in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 76.2% of recorded arrivals came within three minutes and 6.3% of stops were cancelled.
East Midlands Railway trains at Bedford also serve Flitwick (14.8 km south, – on time, – cancelled), Wellingborough (23.0 km north-west, 79.2% on time, 6.1% cancelled), Luton (28.6 km south, 70.7% on time, 6.5% cancelled), Luton Airport Parkway (29.8 km south, 72.0% on time, 6.1% cancelled), Kettering (33.3 km north-west, 71.1% on time, 6.1% cancelled) and Corby (41.7 km north, 83.8% on time, 8.1% cancelled), which are the stations on its network closest to Bedford.
Within 30 km of here, East Midlands Railway runs best at Wellingborough, 23.0 km north-west (79.2%), and worst at Luton, 28.6 km south (70.7%).
The busiest East Midlands Railway station within 30 km of Bedford is Wellingborough, 23.0 km north-west, with about 72 scheduled stops a day.
East Midlands Railway at Bedford has slipped a little, from 79.9% within three minutes in the previous 13 periods to 76.2% in the latest 13, a fall of 3.7 percentage points. Cancellations rose to 6.3% of scheduled stops from 3.7%, which is 2.6 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,954 | 76.4% | 6.7% |
| Period 6 of 2026-27 | 1,842 | 77.1% | 4.2% |
| Period 5 of 2026-27 | 1,824 | 69.0% | 13.4% |
| Period 4 of 2026-27 | 2,016 | 76.1% | 5.5% |
| Period 3 of 2026-27 | 1,960 | 72.5% | 6.1% |
| Period 2 of 2026-27 | 2,043 | 76.5% | 5.3% |
| Period 1 of 2026-27 | 2,322 | 78.4% | 4.5% |
| Period 13 of 2025-26 | 2,187 | 75.0% | 11.3% |
| Period 12 of 2025-26 | 1,991 | 76.7% | 5.8% |
| Period 11 of 2025-26 | 1,979 | 78.7% | 8.9% |
| Period 10 of 2025-26 | 1,814 | 79.8% | 3.2% |
| Period 9 of 2025-26 | 1,972 | 77.4% | 4.6% |
| Period 8 of 2025-26 | 1,956 | 75.9% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bedford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 56,385 | 85.1% | 4.9% |
| West Midlands Railway | 10,299 | 92.1% | 7.6% |
| LNER | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out