Chiswick
CHKLondonManaged by South Western Railway
How this station is performing
Chiswick had 33,494 scheduled stops to Period 7 of 2026-27, about 92 a day. 87.6% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Chiswick opened on 22 August 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Mortlake is the oldest (1846) and Barnes Bridge the newest (1916), with Chiswick in between.
The nearest stations to Chiswick are Kew Gardens (1.2 km west), Gunnersbury (1.2 km north-west), Mortlake (1.5 km south), Barnes Bridge (1.5 km south-east) and Kew Bridge (1.6 km north-west). 77 stations lie within 10 km in all. Of the five, Kew Bridge is the most punctual at 89.8% and Gunnersbury the least at 84.8%, with Chiswick on 87.6%.
Chiswick is one of 2 stations named after an area of London called Chiswick; this one stands 1.3 km from its centre.
Across the whole run of data, the weakest four-week period for Chiswick was Period 9 of 2024-25, at 72.2%, some time before the latest year. The strongest was Period 1 of 2026-27, at 92.5%, and the two are 20.3 percentage points apart. Cancellations peaked at 7.3% of scheduled stops in Period 4 of 2025-26, against 3.5% over the latest 13 periods.
2 of 3 stations of a similar size in London are more punctual than Chiswick on 87.6%. The comparison group includes Barnes Bridge (87.6%), Isleworth (89.5%) and Syon Lane (88.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 33,494 | 87.6% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Chiswick? Delay Repay
These operators call at Chiswick and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,655 | 88.1% | 2.2% |
| Period 6 of 2026-27 | 2,611 | 87.5% | 2.5% |
| Period 5 of 2026-27 | 2,445 | 87.2% | 4.4% |
| Period 4 of 2026-27 | 2,537 | 85.7% | 3.2% |
| Period 3 of 2026-27 | 2,441 | 87.8% | 3.6% |
| Period 2 of 2026-27 | 2,467 | 87.9% | 7.1% |
| Period 1 of 2026-27 | 3,009 | 92.5% | 3.0% |
| Period 13 of 2025-26 | 2,876 | 91.7% | 1.8% |
| Period 12 of 2025-26 | 2,563 | 91.8% | 5.7% |
| Period 11 of 2025-26 | 2,607 | 89.2% | 2.5% |
| Period 10 of 2025-26 | 2,122 | 87.3% | 3.5% |
| Period 9 of 2025-26 | 2,608 | 80.9% | 2.3% |
| Period 8 of 2025-26 | 2,553 | 80.2% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barnes Bridge | 33,493 | 87.6% | 3.5% |
| Isleworth | 33,599 | 89.5% | 3.6% |
| Syon Lane | 33,599 | 88.9% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out