Effingham Junction
EFFSouth EastManaged by South Western Railway
How this station is performing
Effingham Junction had 38,383 scheduled stops to Period 7 of 2026-27, about 105 a day. 85.0% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Effingham Junction opened on 2 July 1888, 138 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Effingham Junction is the newest; the oldest, Leatherhead, opened in 1867.
The nearest stations to Effingham Junction are Horsley (1.7 km south-west), Bookham (2.5 km east), Cobham and Stoke D'abernon (3.6 km north-east), Leatherhead (6.1 km east) and Oxshott (6.3 km north-east). 18 stations lie within 10 km in all. Of the five, Cobham and Stoke D'abernon is the most punctual at 85.6% and Bookham the least at 81.7%, with Effingham Junction on 85.0%.
Effingham Junction is named after Effingham, a Village, home to about 2,722 people, but the station stands 2.6 km from its centre.
Across the whole run of data, the weakest four-week period for Effingham Junction was Period 9 of 2023-24, at 74.1%, some time before the latest year. The strongest was Period 2 of 2023-24, at 94.8%, and the two are 20.7 percentage points apart.
Compared with 3 stations of a similar size in South East, Effingham Junction is the least punctual, at 85.0%. All of them are ahead, including Dorking (Main) (87.4%), Ewell East (91.7%) and Beaconsfield (89.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 38,383 | 85.0% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Effingham Junction? Delay Repay
These operators call at Effingham Junction and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,996 | 91.0% | 2.1% |
| Period 6 of 2026-27 | 2,874 | 84.4% | 1.5% |
| Period 5 of 2026-27 | 2,712 | 85.7% | 3.9% |
| Period 4 of 2026-27 | 3,017 | 87.9% | 1.3% |
| Period 3 of 2026-27 | 2,903 | 86.3% | 3.6% |
| Period 2 of 2026-27 | 2,911 | 81.9% | 5.1% |
| Period 1 of 2026-27 | 3,384 | 88.7% | 2.5% |
| Period 13 of 2025-26 | 3,201 | 88.0% | 1.0% |
| Period 12 of 2025-26 | 2,983 | 83.1% | 2.7% |
| Period 11 of 2025-26 | 2,986 | 83.2% | 1.4% |
| Period 10 of 2025-26 | 2,504 | 81.4% | 4.5% |
| Period 9 of 2025-26 | 2,931 | 79.2% | 1.9% |
| Period 8 of 2025-26 | 2,981 | 82.7% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dorking (Main) | 38,418 | 87.4% | 3.0% |
| Ewell East | 38,268 | 91.7% | 2.8% |
| Beaconsfield | 38,516 | 89.5% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out