South Western Railway at Ashtead
All trains at AshteadSouth Western Railway across BritainSouth East
How this operator is doing here
South Western Railway had 27,994 scheduled stops at Ashtead in the 13 periods to Period 7 of 2026-27, 53% of the station's total. 79.5% of recorded arrivals came within three minutes and 3.5% of stops were cancelled.
South Western Railway trains at Ashtead also serve Leatherhead (2.7 km south-west, 81.4% on time, 3.6% cancelled), Epsom (Surrey) (3.2 km north-east, 79.8% on time, 3.1% cancelled), Chessington South (4.3 km north, 87.0% on time, 3.1% cancelled), Oxshott (4.3 km north-west, 85.3% on time, 3.0% cancelled), Ewell West (5.0 km north-east, 83.0% on time, 3.4% cancelled) and Chessington North (5.1 km north, 87.9% on time, 3.4% cancelled), which are the stations on its network closest to Ashtead.
Within 30 km of here, South Western Railway runs best at Bagshot, 27.0 km west (97.0%), and worst at Woking, 17.4 km west (73.7%).
The busiest South Western Railway station within 30 km of Ashtead is London Waterloo, 24.6 km north-east, with about 1,171 scheduled stops a day.
Of the 2 operators with enough records at Ashtead, South Western Railway is the least punctual, at 79.5%.
Over three full railway years South Western Railway at Ashtead has got worse each time, from 84.1% within three minutes in 2023-24 to 81.6% in 2024-25 and 77.5% in 2025-26.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,184 | 87.3% | 3.0% |
| Period 6 of 2026-27 | 2,164 | 81.1% | 2.5% |
| Period 5 of 2026-27 | 2,184 | 82.9% | 3.8% |
| Period 4 of 2026-27 | 2,181 | 83.3% | 1.4% |
| Period 3 of 2026-27 | 2,054 | 83.1% | 4.5% |
| Period 2 of 2026-27 | 2,159 | 77.1% | 6.1% |
| Period 1 of 2026-27 | 2,416 | 82.9% | 3.5% |
| Period 13 of 2025-26 | 2,344 | 84.0% | 2.4% |
| Period 12 of 2025-26 | 2,093 | 76.1% | 3.5% |
| Period 11 of 2025-26 | 2,119 | 77.9% | 2.0% |
| Period 10 of 2025-26 | 1,786 | 75.0% | 4.9% |
| Period 9 of 2025-26 | 2,127 | 66.7% | 2.9% |
| Period 8 of 2025-26 | 2,183 | 72.9% | 5.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ashtead
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,182 | 91.2% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out