Ashtead
AHDSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Ashtead had 53,176 scheduled stops to Period 7 of 2026-27, about 146 a day. 85.0% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Ashtead opened on 1 February 1859, 167 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ashtead is the oldest; the next oldest, Epsom (Surrey), dates from 1859.
The nearest stations to Ashtead are Leatherhead (2.7 km south-west), Epsom (Surrey) (3.2 km north-east), Chessington South (4.3 km north), Oxshott (4.3 km north-west) and Tattenham Corner (4.6 km east). 40 stations lie within 10 km in all. Of the five, Chessington South is the most punctual at 87.0% and Tattenham Corner the least at 84.5%, with Ashtead on 85.0%.
Ashtead takes its name from a Village called Ashtead, home to about 14,169 people, and the station stands 1.1 km from its centre.
2 operators call at Ashtead: South Western Railway (79.5%, 53% of stops) and GTR (91.2%, 47% of stops). The operator you travel with matters: GTR reaches 91.2% within three minutes while South Western Railway manages 79.5%, a gap of 11.7 percentage points.
2 of 3 stations of a similar size in South East are more punctual than Ashtead on 85.0%. The comparison group includes Ascot (Berks) (91.8%), Leatherhead (85.4%) and Stone Crossing (84.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 27,994 | 79.5% | 3.5% |
| GTR | 25,182 | 91.2% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Ashtead? Delay Repay
These operators call at Ashtead and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,129 | 88.5% | 4.4% |
| Period 6 of 2026-27 | 4,094 | 85.7% | 1.8% |
| Period 5 of 2026-27 | 4,065 | 85.7% | 3.5% |
| Period 4 of 2026-27 | 4,127 | 87.6% | 1.4% |
| Period 3 of 2026-27 | 3,981 | 86.4% | 3.5% |
| Period 2 of 2026-27 | 4,100 | 83.6% | 3.8% |
| Period 1 of 2026-27 | 4,579 | 87.4% | 2.1% |
| Period 13 of 2025-26 | 4,411 | 88.0% | 4.2% |
| Period 12 of 2025-26 | 3,965 | 83.1% | 2.1% |
| Period 11 of 2025-26 | 4,031 | 83.8% | 1.8% |
| Period 10 of 2025-26 | 3,550 | 83.9% | 3.4% |
| Period 9 of 2025-26 | 4,009 | 77.9% | 2.9% |
| Period 8 of 2025-26 | 4,135 | 82.5% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ascot (Berks) | 53,193 | 91.8% | 2.0% |
| Leatherhead | 53,226 | 85.4% | 3.1% |
| Stone Crossing | 53,122 | 84.7% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out