GTR at Ashtead
How this operator is doing here
GTR had 25,182 scheduled stops at Ashtead in the 13 periods to Period 7 of 2026-27, 47% of the station's total. 91.2% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
GTR trains at Ashtead also serve Leatherhead (2.7 km south-west, 89.7% on time, 2.5% cancelled), Epsom (Surrey) (3.2 km north-east, 90.8% on time, 2.6% cancelled), Tattenham Corner (4.6 km east, 84.5% on time, 2.6% cancelled), Epsom Downs (4.8 km east, 92.6% on time, 3.1% cancelled), Ewell East (5.5 km north-east, 91.7% on time, 2.8% cancelled) and Tadworth (5.8 km south-east, 85.9% on time, 2.9% cancelled), which are the stations on its network closest to Ashtead.
Within 30 km of here, GTR runs best at Birkbeck, 19.9 km north-east (98.1%), and worst at Kenley, 14.3 km east (66.9%).
The busiest GTR station within 30 km of Ashtead is East Croydon, 16.2 km north-east, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Ashtead, GTR is the most punctual, at 91.2%.
GTR at Ashtead has slipped a little, from 94.0% within three minutes in the previous 13 periods to 91.2% in the latest 13, a fall of 2.8 percentage points. Cancellations rose to 2.5% of scheduled stops from 1.5%, which is 1.0 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,945 | 89.9% | 6.0% |
| Period 6 of 2026-27 | 1,930 | 90.8% | 1.0% |
| Period 5 of 2026-27 | 1,881 | 88.8% | 3.1% |
| Period 4 of 2026-27 | 1,946 | 92.5% | 1.5% |
| Period 3 of 2026-27 | 1,927 | 90.0% | 2.5% |
| Period 2 of 2026-27 | 1,941 | 90.4% | 1.2% |
| Period 1 of 2026-27 | 2,163 | 92.2% | 0.6% |
| Period 13 of 2025-26 | 2,067 | 92.8% | 6.2% |
| Period 12 of 2025-26 | 1,872 | 90.8% | 0.6% |
| Period 11 of 2025-26 | 1,912 | 90.4% | 1.5% |
| Period 10 of 2025-26 | 1,764 | 92.8% | 1.8% |
| Period 9 of 2025-26 | 1,882 | 90.6% | 2.9% |
| Period 8 of 2025-26 | 1,952 | 92.9% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ashtead
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 27,994 | 79.5% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out