Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Ashtead

All trains at AshteadGTR across BritainSouth East

On time, last 13 periods91.2%Whole station: 85.0%
Cancelled2.5%Whole station: 3.0%
Scheduled stops25,182Of 53,176 at the station

How this operator is doing here

GTR had 25,182 scheduled stops at Ashtead in the 13 periods to Period 7 of 2026-27, 47% of the station's total. 91.2% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.

GTR trains at Ashtead also serve Leatherhead (2.7 km south-west, 89.7% on time, 2.5% cancelled), Epsom (Surrey) (3.2 km north-east, 90.8% on time, 2.6% cancelled), Tattenham Corner (4.6 km east, 84.5% on time, 2.6% cancelled), Epsom Downs (4.8 km east, 92.6% on time, 3.1% cancelled), Ewell East (5.5 km north-east, 91.7% on time, 2.8% cancelled) and Tadworth (5.8 km south-east, 85.9% on time, 2.9% cancelled), which are the stations on its network closest to Ashtead.

Within 30 km of here, GTR runs best at Birkbeck, 19.9 km north-east (98.1%), and worst at Kenley, 14.3 km east (66.9%).

The busiest GTR station within 30 km of Ashtead is East Croydon, 16.2 km north-east, with about 813 scheduled stops a day.

Of the 2 operators with enough records at Ashtead, GTR is the most punctual, at 91.2%.

GTR at Ashtead has slipped a little, from 94.0% within three minutes in the previous 13 periods to 91.2% in the latest 13, a fall of 2.8 percentage points. Cancellations rose to 2.5% of scheduled stops from 1.5%, which is 1.0 percentage points more.

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 95.4%Period 2 of 2023-24: 97.1%Period 3 of 2023-24: 94.7%Period 4 of 2023-24: 96.0%Period 5 of 2023-24: 95.7%Period 6 of 2023-24: 96.4%Period 7 of 2023-24: 95.4%Period 8 of 2023-24: 92.6%Period 9 of 2023-24: 92.8%Period 10 of 2023-24: 95.4%Period 11 of 2023-24: 92.5%Period 12 of 2023-24: 95.8%Period 13 of 2023-24: 94.9%Period 1 of 2024-25: 95.2%Period 2 of 2024-25: 95.8%Period 3 of 2024-25: 94.4%Period 4 of 2024-25: 94.6%Period 5 of 2024-25: 94.9%Period 6 of 2024-25: 95.9%Period 7 of 2024-25: 92.7%Period 8 of 2024-25: 94.5%Period 9 of 2024-25: 90.8%Period 10 of 2024-25: 95.6%Period 11 of 2024-25: 92.7%Period 12 of 2024-25: 94.2%Period 13 of 2024-25: 96.5%Period 1 of 2025-26: 94.6%Period 2 of 2025-26: 94.8%Period 3 of 2025-26: 95.0%Period 4 of 2025-26: 93.1%Period 5 of 2025-26: 92.6%Period 6 of 2025-26: 93.8%Period 7 of 2025-26: 94.1%Period 8 of 2025-26: 92.9%Period 9 of 2025-26: 90.6%Period 10 of 2025-26: 92.8%Period 11 of 2025-26: 90.4%Period 12 of 2025-26: 90.8%Period 13 of 2025-26: 92.8%Period 1 of 2026-27: 92.2%Period 2 of 2026-27: 90.4%Period 3 of 2026-27: 90.0%Period 4 of 2026-27: 92.5%Period 5 of 2026-27: 88.8%Period 6 of 2026-27: 90.8%Period 7 of 2026-27: 89.9%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 2.1%Period 2 of 2023-24: 1.7%Period 3 of 2023-24: 0.8%Period 4 of 2023-24: 1.7%Period 5 of 2023-24: 1.7%Period 6 of 2023-24: 1.5%Period 7 of 2023-24: 1.0%Period 8 of 2023-24: 1.4%Period 9 of 2023-24: 1.2%Period 10 of 2023-24: 4.0%Period 11 of 2023-24: 0.8%Period 12 of 2023-24: 0.4%Period 13 of 2023-24: 1.2%Period 1 of 2024-25: 0.9%Period 2 of 2024-25: 1.0%Period 3 of 2024-25: 2.0%Period 4 of 2024-25: 1.4%Period 5 of 2024-25: 1.9%Period 6 of 2024-25: 1.4%Period 7 of 2024-25: 2.0%Period 8 of 2024-25: 1.2%Period 9 of 2024-25: 1.8%Period 10 of 2024-25: 2.3%Period 11 of 2024-25: 1.1%Period 12 of 2024-25: 0.8%Period 13 of 2024-25: 1.2%Period 1 of 2025-26: 1.2%Period 2 of 2025-26: 1.4%Period 3 of 2025-26: 0.9%Period 4 of 2025-26: 1.8%Period 5 of 2025-26: 2.3%Period 6 of 2025-26: 1.8%Period 7 of 2025-26: 1.5%Period 8 of 2025-26: 3.0%Period 9 of 2025-26: 2.9%Period 10 of 2025-26: 1.8%Period 11 of 2025-26: 1.5%Period 12 of 2025-26: 0.6%Period 13 of 2025-26: 6.2%Period 1 of 2026-27: 0.6%Period 2 of 2026-27: 1.2%Period 3 of 2026-27: 2.5%Period 4 of 2026-27: 1.5%Period 5 of 2026-27: 3.1%Period 6 of 2026-27: 1.0%Period 7 of 2026-27: 6.0%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,94589.9%6.0%
Period 6 of 2026-271,93090.8%1.0%
Period 5 of 2026-271,88188.8%3.1%
Period 4 of 2026-271,94692.5%1.5%
Period 3 of 2026-271,92790.0%2.5%
Period 2 of 2026-271,94190.4%1.2%
Period 1 of 2026-272,16392.2%0.6%
Period 13 of 2025-262,06792.8%6.2%
Period 12 of 2025-261,87290.8%0.6%
Period 11 of 2025-261,91290.4%1.5%
Period 10 of 2025-261,76492.8%1.8%
Period 9 of 2025-261,88290.6%2.9%
Period 8 of 2025-261,95292.9%3.0%

Time of year

80%90%100%P1: 94.3%1P2: 94.4%2P3: 93.5%3P4: 94.0%4P5: 92.9%5P6: 94.1%6P7: 93.0%7P8: 93.3%8P9: 91.4%9P10: 94.6%10P11: 91.8%11P12: 93.6%12P13: 94.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Ashtead

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway27,99479.5%3.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out