Stone Crossing
SCGSouth EastManaged by Southeastern
How this station is performing
Stone Crossing had 53,122 scheduled stops to Period 7 of 2026-27, about 146 a day. 84.7% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Stone Crossing opened on 2 November 1908, 118 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Greenhithe for Bluewater is the oldest (1849) and Ebbsfleet International the newest (2009), with Stone Crossing in between.
The nearest stations to Stone Crossing are Greenhithe for Bluewater (1.1 km east), Dartford (3.1 km west), Swanscombe (3.3 km east), Purfleet (3.8 km north-west) and Ebbsfleet International (4.1 km east). 24 stations lie within 10 km in all. Of the five, Purfleet is the most punctual at 91.6% and Ebbsfleet International the least at 81.2%, with Stone Crossing on 84.7%.
Stone Crossing is named after Stone, a Village, home to about 12,982 people, but the station stands 0.4 km from its centre.
2 operators call at Stone Crossing: Southeastern (86.6%, 52% of stops) and GTR (82.6%, 48% of stops). They are close together, with Southeastern leading on 86.6% and GTR trailing on 82.6%, a gap of 4.0 percentage points.
Compared with 3 stations of a similar size in South East, Stone Crossing is the least punctual, at 84.7%. All of them are ahead, including Ashtead (85.0%), Ascot (Berks) (91.8%) and Leatherhead (85.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 27,470 | 86.6% | 1.8% |
| GTR | 25,652 | 82.6% | 5.1% |
Operators with their own page for this station are linked to it.
Late train at Stone Crossing? Delay Repay
These operators call at Stone Crossing and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,345 | 84.4% | 2.9% |
| Period 6 of 2026-27 | 4,087 | 82.9% | 3.3% |
| Period 5 of 2026-27 | 3,865 | 84.6% | 4.0% |
| Period 4 of 2026-27 | 4,079 | 86.2% | 2.9% |
| Period 3 of 2026-27 | 3,867 | 82.8% | 4.1% |
| Period 2 of 2026-27 | 4,196 | 83.9% | 3.8% |
| Period 1 of 2026-27 | 4,770 | 88.6% | 2.9% |
| Period 13 of 2025-26 | 4,545 | 87.2% | 1.8% |
| Period 12 of 2025-26 | 2,721 | 81.7% | 1.9% |
| Period 11 of 2025-26 | 4,222 | 85.3% | 3.1% |
| Period 10 of 2025-26 | 3,947 | 88.1% | 5.3% |
| Period 9 of 2025-26 | 4,133 | 80.6% | 5.3% |
| Period 8 of 2025-26 | 4,345 | 82.7% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ashtead | 53,176 | 85.0% | 3.0% |
| Ascot (Berks) | 53,193 | 91.8% | 2.0% |
| Leatherhead | 53,226 | 85.4% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out