Amberley
AMYSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Amberley had 22,714 scheduled stops to Period 7 of 2026-27, about 62 a day. 74.4% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Amberley opened on 3 August 1863, 163 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Amberley is the newest; the oldest, Ford, opened in 1846.
The nearest stations to Amberley are Arundel (5.4 km south), Pulborough (7.0 km north), Ford (7.9 km south), Littlehampton (9.6 km south) and Angmering (9.7 km south-east). 5 stations lie within 10 km in all. At 74.4%, Amberley is less punctual than all of them; the best of the five, Littlehampton, manages 83.3%.
Amberley is one of 3 stations named after a Village called Amberley, home to about 586 people; this one stands 1.3 km from its centre.
Amberley has slipped a little, from 79.0% within three minutes in the previous 13 periods to 74.4% in the latest 13, a fall of 4.6 percentage points. Cancellations held steady at 2.9% of scheduled stops, against 2.9% before.
Compared with 3 stations of a similar size in South East, Amberley is the least punctual, at 74.4%. All of them are ahead, including Beltring (94.7%), East Farleigh (95.0%) and Wateringbury (95.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 22,714 | 74.4% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Amberley? Delay Repay
These operators call at Amberley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,746 | 68.6% | 2.5% |
| Period 6 of 2026-27 | 1,282 | 28.9% | 3.1% |
| Period 5 of 2026-27 | 1,778 | 63.5% | 7.5% |
| Period 4 of 2026-27 | 1,778 | 73.8% | 2.4% |
| Period 3 of 2026-27 | 1,757 | 76.4% | 3.6% |
| Period 2 of 2026-27 | 1,780 | 78.6% | 2.5% |
| Period 1 of 2026-27 | 2,052 | 82.9% | 1.5% |
| Period 13 of 2025-26 | 1,933 | 85.5% | 3.1% |
| Period 12 of 2025-26 | 1,748 | 81.9% | 2.6% |
| Period 11 of 2025-26 | 1,784 | 80.7% | 2.7% |
| Period 10 of 2025-26 | 1,549 | 77.4% | 1.9% |
| Period 9 of 2025-26 | 1,778 | 73.4% | 1.8% |
| Period 8 of 2025-26 | 1,749 | 79.7% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Beltring | 22,703 | 94.7% | 1.8% |
| East Farleigh | 22,703 | 95.0% | 1.8% |
| Wateringbury | 22,703 | 95.1% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out