Halling
HAISouth EastManaged by Southeastern
How this station is performing
Halling had 23,766 scheduled stops to Period 7 of 2026-27, about 65 a day. 95.0% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Halling opened on 1 March 1890, 136 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Snodland is the oldest (1856) and New Hythe the newest (1929), with Halling in between.
The nearest stations to Halling are Snodland (2.4 km south), Cuxton (2.7 km north-east), New Hythe (4.5 km south), Aylesford (5.8 km south) and Sole Street (5.8 km north-west). 16 stations lie within 10 km in all. Of the five, New Hythe is the most punctual at 95.2% and Sole Street the least at 83.2%, with Halling on 95.0%.
Halling is one of 2 stations named after a Village called Halling, home to about 3,975 people; this one stands 0.3 km from its centre.
In South East, Halling ranks 22nd of 409 ranked stations. Its 95.0% is 13.8 percentage points better than the area median of 81.2%.
1 of 3 stations of a similar size in South East are more punctual than Halling on 95.0%. The comparison group includes New Hythe (95.2%), Aylesford (94.7%) and Cuxton (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 23,766 | 95.0% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Halling? Delay Repay
These operators call at Halling and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,868 | 94.8% | 1.1% |
| Period 6 of 2026-27 | 1,805 | 96.1% | 1.3% |
| Period 5 of 2026-27 | 1,774 | 95.5% | 2.7% |
| Period 4 of 2026-27 | 1,868 | 96.7% | 1.3% |
| Period 3 of 2026-27 | 1,808 | 93.6% | 1.9% |
| Period 2 of 2026-27 | 1,766 | 95.1% | 1.3% |
| Period 1 of 2026-27 | 2,111 | 97.8% | 0.8% |
| Period 13 of 2025-26 | 1,954 | 95.6% | 2.1% |
| Period 12 of 2025-26 | 1,808 | 95.3% | 0.6% |
| Period 11 of 2025-26 | 1,836 | 95.4% | 1.2% |
| Period 10 of 2025-26 | 1,560 | 94.6% | 1.2% |
| Period 9 of 2025-26 | 1,740 | 90.8% | 4.1% |
| Period 8 of 2025-26 | 1,868 | 93.0% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out