Hayle
HYLSouth WestManaged by Great Western Railway
How this station is performing
Hayle has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 16,910 scheduled stops, about 46 a day. In those periods 67.9% of stops arrived within three minutes of the timetable and 7.0% of scheduled stops were cancelled.
Hayle opened on 11 March 1852, 174 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hayle is the oldest; the next oldest, St Erth, dates from 1852.
The nearest stations to Hayle are Lelant (1.2 km west), Lelant Saltings (1.7 km south-west), St Erth (2.4 km south-west), Carbis Bay (3.4 km north-west) and St Ives (Cornwall) (4.8 km north-west). 6 stations lie within 10 km in all. At 67.9%, Hayle is less punctual than all of them; the best of the five, Lelant Saltings, manages 97.8%.
Hayle takes its name from a town called Hayle, home to about 9,772 people, and the station stands 0.4 km from its centre.
2 operators call at Hayle: Great Western Railway (68.7%, 92% of stops) and CrossCountry (56.5%, 8% of stops). The operator you travel with matters: Great Western Railway reaches 68.7% within three minutes while CrossCountry manages 56.5%, a gap of 12.2 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Hayle on 67.9%. The comparison group includes Yeovil Junction (63.0%), Bridgwater (72.2%) and Starcross (77.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 15,577 | 68.7% | 6.5% |
| CrossCountry | 1,333 | 56.5% | 12.9% |
Operators with their own page for this station are linked to it.
Late train at Hayle? Delay Repay
These operators call at Hayle and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,271 | 75.7% | 3.5% |
| Period 6 of 2026-27 | 1,293 | 72.4% | 9.7% |
| Period 5 of 2026-27 | 1,323 | 59.1% | 13.4% |
| Period 4 of 2026-27 | 1,320 | 60.9% | 10.1% |
| Period 3 of 2026-27 | 1,307 | 65.3% | 9.3% |
| Period 2 of 2026-27 | 1,314 | 66.3% | 7.0% |
| Period 1 of 2026-27 | 1,504 | 74.8% | 2.9% |
| Period 13 of 2025-26 | 1,432 | 72.9% | 3.3% |
| Period 12 of 2025-26 | 1,301 | 62.9% | 3.1% |
| Period 11 of 2025-26 | 1,309 | 70.8% | 10.5% |
| Period 10 of 2025-26 | 1,167 | 63.7% | 8.4% |
| Period 9 of 2025-26 | 1,057 | – | 7.0% |
| Period 8 of 2025-26 | 1,312 | 64.4% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Yeovil Junction | 17,042 | 63.0% | 2.8% |
| Bridgwater | 16,539 | 72.2% | 3.0% |
| Starcross | 17,376 | 77.1% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out