Wylde Green
WYLWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Wylde Green had 47,030 scheduled stops to Period 7 of 2026-27, about 129 a day. 84.7% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Wylde Green opened on 2 June 1862, 164 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Wylde Green is the oldest; the next oldest, Chester Road, dates from 1862.
The nearest stations to Wylde Green are Chester Road (1.1 km south), Erdington (2.0 km south), Sutton Coldfield (2.2 km north), Gravelly Hill (3.7 km south-west) and Four Oaks (3.8 km north). 25 stations lie within 10 km in all. Of the five, Sutton Coldfield is the most punctual at 84.8% and Erdington the least at 81.9%, with Wylde Green on 84.7%.
Wylde Green takes its name from a neighborhood called Wylde Green, and the station stands 1.7 km from its centre.
Across the whole run of data, the weakest four-week period for Wylde Green was Period 9 of 2024-25, at 65.2%, some time before the latest year. The strongest was Period 12 of 2025-26, at 90.3%, and the two are 25.1 percentage points apart. Cancellations peaked at 6.5% of scheduled stops in Period 4 of 2025-26, against 2.8% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Wylde Green is the most punctual, at 84.7%. The comparison group includes Four Oaks (82.7%), Chester Road (84.4%) and Gravelly Hill (82.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 47,030 | 84.7% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Wylde Green? Delay Repay
These operators call at Wylde Green and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,668 | 82.1% | 2.6% |
| Period 6 of 2026-27 | 3,668 | 83.8% | 4.2% |
| Period 5 of 2026-27 | 3,668 | 86.2% | 2.6% |
| Period 4 of 2026-27 | 3,472 | 80.3% | 4.4% |
| Period 3 of 2026-27 | 3,293 | 85.7% | 2.4% |
| Period 2 of 2026-27 | 3,208 | 85.7% | 2.6% |
| Period 1 of 2026-27 | 4,241 | 87.4% | 1.9% |
| Period 13 of 2025-26 | 4,011 | 88.4% | 2.1% |
| Period 12 of 2025-26 | 3,668 | 90.3% | 1.1% |
| Period 11 of 2025-26 | 3,568 | 90.1% | 6.4% |
| Period 10 of 2025-26 | 3,298 | 85.7% | 1.7% |
| Period 9 of 2025-26 | 3,599 | 76.5% | 2.3% |
| Period 8 of 2025-26 | 3,668 | 78.7% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Four Oaks | 47,038 | 82.7% | 2.3% |
| Chester Road | 46,979 | 84.4% | 2.7% |
| Gravelly Hill | 46,979 | 82.5% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out