Gravelly Hill
GVHWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Gravelly Hill had 46,979 scheduled stops to Period 7 of 2026-27, about 129 a day. 82.5% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Gravelly Hill opened on 2 June 1862, 164 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Aston is the oldest (1854) and Witton (West Midlands) the newest (1876), with Gravelly Hill in between.
The nearest stations to Gravelly Hill are Erdington (1.7 km north-east), Aston (1.8 km south-west), Witton (West Midlands) (2.1 km west), Chester Road (2.7 km north-east) and Duddeston (3.2 km south-west). 36 stations lie within 10 km in all. Of the five, Witton (West Midlands) is the most punctual at 90.5% and Erdington the least at 81.9%, with Gravelly Hill on 82.5%.
Gravelly Hill takes its name from a neighborhood called Gravelly Hill, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Gravelly Hill was Period 9 of 2024-25, at 64.5%, some time before the latest year. The strongest was Period 12 of 2025-26, at 89.1%, and the two are 24.6 percentage points apart. Cancellations peaked at 6.5% of scheduled stops in Period 4 of 2025-26, against 2.7% over the latest 13 periods.
2 of 3 stations of a similar size in West Midlands are more punctual than Gravelly Hill on 82.5%. The comparison group includes Chester Road (84.4%), Erdington (81.9%) and Wylde Green (84.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 46,979 | 82.5% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Gravelly Hill? Delay Repay
These operators call at Gravelly Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,664 | 79.6% | 2.5% |
| Period 6 of 2026-27 | 3,664 | 81.9% | 3.3% |
| Period 5 of 2026-27 | 3,664 | 84.4% | 2.7% |
| Period 4 of 2026-27 | 3,469 | 78.4% | 4.3% |
| Period 3 of 2026-27 | 3,290 | 84.4% | 2.4% |
| Period 2 of 2026-27 | 3,204 | 84.1% | 2.5% |
| Period 1 of 2026-27 | 4,237 | 86.1% | 1.9% |
| Period 13 of 2025-26 | 4,006 | 86.8% | 2.0% |
| Period 12 of 2025-26 | 3,664 | 89.1% | 1.1% |
| Period 11 of 2025-26 | 3,564 | 89.0% | 6.4% |
| Period 10 of 2025-26 | 3,294 | 83.2% | 1.7% |
| Period 9 of 2025-26 | 3,595 | 71.5% | 2.3% |
| Period 8 of 2025-26 | 3,664 | 73.8% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chester Road | 46,979 | 84.4% | 2.7% |
| Erdington | 46,978 | 81.9% | 2.7% |
| Wylde Green | 47,030 | 84.7% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out