Worcester Park
WCPLondonManaged by South Western Railway
How this station is performing
Worcester Park had 28,661 scheduled stops to Period 7 of 2026-27, about 79 a day. 84.1% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Worcester Park opened on 4 April 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, New Malden is the oldest (1846) and Tolworth the newest (1938), with Worcester Park in between.
The nearest stations to Worcester Park are Malden Manor (1.1 km west), Motspur Park (1.6 km north), Stoneleigh (2.0 km south), Tolworth (2.5 km west) and New Malden (2.6 km north). 67 stations lie within 10 km in all. Of the five, Malden Manor is the most punctual at 87.3% and Stoneleigh the least at 83.5%, with Worcester Park on 84.1%.
Worcester Park takes its name from an area of London called Worcester Park, home to about 16,034 people, and the station stands 0.8 km from its centre.
Compared with 3 stations of a similar size in London, Worcester Park is the least punctual, at 84.1%. All of them are ahead, including Meridian Water (96.5%), Wembley Stadium (88.2%) and Brimsdown (86.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 28,661 | 84.1% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Worcester Park? Delay Repay
These operators call at Worcester Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,239 | 88.8% | 3.3% |
| Period 6 of 2026-27 | 2,222 | 86.3% | 2.4% |
| Period 5 of 2026-27 | 2,240 | 85.8% | 3.4% |
| Period 4 of 2026-27 | 2,241 | 85.9% | 1.3% |
| Period 3 of 2026-27 | 2,114 | 85.8% | 4.6% |
| Period 2 of 2026-27 | 2,220 | 81.2% | 5.9% |
| Period 1 of 2026-27 | 2,545 | 86.9% | 3.2% |
| Period 13 of 2025-26 | 2,194 | 87.2% | 1.5% |
| Period 12 of 2025-26 | 2,143 | 82.2% | 3.5% |
| Period 11 of 2025-26 | 2,179 | 81.9% | 1.7% |
| Period 10 of 2025-26 | 1,840 | 83.6% | 4.7% |
| Period 9 of 2025-26 | 2,242 | 76.9% | 2.8% |
| Period 8 of 2025-26 | 2,242 | 79.5% | 5.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Meridian Water | 29,069 | 96.5% | 4.2% |
| Wembley Stadium | 29,934 | 88.2% | 1.7% |
| Brimsdown | 29,950 | 86.4% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out