GTR at Woolston
How this operator is doing here
GTR had 20,534 scheduled stops at Woolston in the 13 periods to Period 7 of 2026-27, 59% of the station's total. 84.5% of recorded arrivals came within three minutes and 7.6% of stops were cancelled.
GTR trains at Woolston also serve Sholing (0.9 km east, – on time, – cancelled), St Denys (2.7 km north, – on time, – cancelled), Southampton Central (2.8 km west, 84.3% on time, 6.9% cancelled), Netley (3.6 km south-east, – on time, – cancelled), Southampton Airport Parkway (5.8 km north, 66.7% on time, 7.5% cancelled) and Eastleigh (7.9 km north, 58.4% on time, 7.6% cancelled), which are the stations on its network closest to Woolston.
Within 30 km of here, GTR runs best at Southampton Central, 2.8 km west (84.3%), and worst at Fratton, 24.2 km south-east (73.2%).
The busiest GTR station within 30 km of Woolston is Havant, 28.2 km east, with about 159 scheduled stops a day.
Of the 2 operators with enough records at Woolston, GTR is the most punctual, at 84.5%.
GTR at Woolston has slipped a little, from 89.2% within three minutes in the previous 13 periods to 84.5% in the latest 13, a fall of 4.7 percentage points. Cancellations held steady at 7.6% of scheduled stops, against 7.3% before.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,589 | 79.0% | 7.1% |
| Period 6 of 2026-27 | 1,504 | 71.2% | 6.9% |
| Period 5 of 2026-27 | 1,588 | 78.4% | 4.9% |
| Period 4 of 2026-27 | 1,591 | 86.3% | 4.8% |
| Period 3 of 2026-27 | 1,455 | 88.0% | 10.7% |
| Period 2 of 2026-27 | 1,590 | 87.0% | 11.0% |
| Period 1 of 2026-27 | 1,888 | 86.3% | 7.2% |
| Period 13 of 2025-26 | 1,720 | 88.5% | 6.3% |
| Period 12 of 2025-26 | 1,453 | 86.2% | 7.5% |
| Period 11 of 2025-26 | 1,592 | 90.6% | 8.1% |
| Period 10 of 2025-26 | 1,386 | 88.4% | 9.9% |
| Period 9 of 2025-26 | 1,588 | 83.2% | 5.8% |
| Period 8 of 2025-26 | 1,590 | 85.9% | 9.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Woolston
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 14,006 | 75.3% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out