Woolston
WLSSouth EastManaged by South Western Railway
How this station is performing
Woolston had 34,540 scheduled stops to Period 7 of 2026-27, about 95 a day. 80.7% of recorded arrivals were within three minutes of the timetable and 5.4% of scheduled stops were cancelled.
Woolston opened on 5 March 1866, 160 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Woolston is the newest; the oldest, Southampton Central, opened in 1847.
The nearest stations to Woolston are Sholing (0.9 km east), Bitterne (2.1 km north), St Denys (2.7 km north), Southampton Central (2.8 km west) and Netley (3.6 km south-east). 17 stations lie within 10 km in all. At 80.7%, Woolston is more punctual than every one of them; the best of the five, Netley, manages 79.2%.
Woolston is one of 7 stations named after a suburb called Woolston, home to about 13,852 people; this one stands 0.7 km from its centre.
2 operators call at Woolston: GTR (84.5%, 59% of stops) and South Western Railway (75.3%, 41% of stops). The operator you travel with matters: GTR reaches 84.5% within three minutes while South Western Railway manages 75.3%, a gap of 9.2 percentage points.
2 of 3 stations of a similar size in South East are more punctual than Woolston on 80.7%. The comparison group includes Taplow (82.7%), Farnborough (Main) (79.6%) and Aylesbury (90.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 20,534 | 84.5% | 7.6% |
| South Western Railway | 14,006 | 75.3% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Woolston? Delay Repay
These operators call at Woolston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,674 | 70.9% | 5.2% |
| Period 6 of 2026-27 | 2,517 | 61.6% | 4.8% |
| Period 5 of 2026-27 | 2,676 | 75.3% | 3.5% |
| Period 4 of 2026-27 | 2,644 | 80.1% | 3.3% |
| Period 3 of 2026-27 | 2,528 | 81.8% | 7.6% |
| Period 2 of 2026-27 | 2,668 | 80.1% | 8.2% |
| Period 1 of 2026-27 | 3,130 | 84.9% | 5.0% |
| Period 13 of 2025-26 | 2,907 | 88.0% | 4.0% |
| Period 12 of 2025-26 | 2,454 | 85.8% | 5.4% |
| Period 11 of 2025-26 | 2,676 | 89.0% | 5.8% |
| Period 10 of 2025-26 | 2,339 | 85.8% | 6.7% |
| Period 9 of 2025-26 | 2,670 | 80.5% | 3.9% |
| Period 8 of 2025-26 | 2,657 | 83.7% | 6.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Taplow | 34,577 | 82.7% | 3.7% |
| Farnborough (Main) | 34,594 | 79.6% | 3.2% |
| Aylesbury | 35,091 | 90.1% | 1.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out