Woodhouse
WDHYorkshire and The HumberManaged by Northern Trains
How this station is performing
Woodhouse has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 13,384 scheduled stops, about 37 a day. In those periods 81.8% of stops arrived within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
The nearest stations to Woodhouse are Darnall (4.3 km north-west), Kiveton Bridge (6.5 km south-east), Meadowhall (7.0 km north-west), Sheffield (7.1 km west) and Rotherham Central (7.6 km north). 6 stations lie within 10 km in all. Of the five, Kiveton Bridge is the most punctual at 83.9% and Sheffield the least at 69.1%, with Woodhouse on 81.8%.
Woodhouse is one of 5 stations named after a suburb called Woodhouse; this one stands 1.0 km from its centre.
Woodhouse has slipped a little, from 85.8% within three minutes in the previous 13 periods to 81.8% in the latest 13, a fall of 4.0 percentage points. Cancellations fell to 2.0% of scheduled stops from 5.0%, which is 3.0 percentage points fewer.
Across the whole run of data, the weakest four-week period for Woodhouse was Period 9 of 2023-24, at 72.1%, some time before the latest year. The strongest was Period 2 of 2024-25, at 91.8%, and the two are 19.7 percentage points apart. Cancellations peaked at 18.7% of scheduled stops in Period 8 of 2023-24, against 2.0% over the latest 13 periods.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Woodhouse on 81.8%. The comparison group includes Thorne North (79.8%), South Elmsall (72.0%) and Darnall (83.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,384 | 81.8% | 2.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,056 | 81.1% | 1.6% |
| Period 6 of 2026-27 | 1,056 | 82.4% | 1.0% |
| Period 5 of 2026-27 | 1,056 | 80.4% | 1.9% |
| Period 4 of 2026-27 | 1,056 | 83.5% | 4.5% |
| Period 3 of 2026-27 | 1,053 | 80.9% | 2.6% |
| Period 2 of 2026-27 | 1,036 | 80.5% | 2.2% |
| Period 1 of 2026-27 | 1,172 | – | 1.4% |
| Period 13 of 2025-26 | 1,114 | 86.2% | 1.0% |
| Period 12 of 2025-26 | 815 | 78.4% | 1.0% |
| Period 11 of 2025-26 | 1,016 | 83.8% | 1.8% |
| Period 10 of 2025-26 | 922 | 83.1% | 3.5% |
| Period 9 of 2025-26 | 1,016 | 79.1% | 2.1% |
| Period 8 of 2025-26 | 1,016 | 81.8% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Thorne North | 13,360 | 79.8% | 3.4% |
| South Elmsall | 13,211 | 72.0% | 2.1% |
| Darnall | 13,203 | 83.2% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out